Loading...
HomeMy WebLinkAbout266499_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101104031 PROJECT ADDRESS: 1412 1/2 W Hall Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/13/2020 INITIAL REVIEW 7/30/2020 EXPIRATION 1/9/2021 RECHECKS: 1.11/2/2020 PROJECT APPLICANT CONTACT PERSON: 2. David Ngo 3. TEL: (714)818-5458 FAX: VALUATION: $50,000.00 EMAIL: dragondesignbuild@yahoo.com FLOOD ZONE: X-0602320259J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Sheet A1: Wall between existing residence and new ADU shall be one-hour fire-rated wall. Wall shall extended from foundation to the roof sheathing. Please provide wall construction assembly detail and clearly cross-reference onto the plan. 2nd Review Comment: Response was incomplete. Please provide construction detail for the one-hour wall assembly. Details shall be clearly cross-reference onto the plan. Sheet A1: Exterior wall located less than 5-ft from the property line shall be protected with one-hour fire-rated wall. Please provide wall assembly detail and clearly cross-reference onto the plan. 2nd Review Comment: Response was incomplete. Please provide construction detail for the one-hour wall assembly. Details shall be clearly cross-reference onto the plan. Sheet A1: existing bathroom adjacent to the new addition – Please provide/show bathroom exhaust fan. 2nd Review Comment: No response provided. Please provide/show bathroom exhaust fan. On the plan, please show smoke and carbon monoxide alarm for the new ADU and existing residence. Smoke and carbon monoxide alarm shall be provided in accordance with Section R314 and R315, respectively. 2nd Review Comment: No response provided. Please provide/show bathroom exhaust fan. Sheet A2: Please specify ICC report number for the tile roof. 2nd Review Comment: No response provided. Please specify ICC report number on the plan for the tile roof. Sheet A2: West wall located less than 5-ft from the property line – no eave vent shall be provided on the west wall. 2nd Review Comment: Please specify no eave or wall vent on the west wall. Sheet S1; Section B-B – please revise building section to show fire-rated wall between two unit extending to the underside of roof sheathing. 2nd Review Comment: Please coordinate and revise title block for the building sections (A-A vs. B-B). Sheet S1: Please provide shear wall schedule. 2nd Review Comment: No response provided. Please provide shear wall schedule on the plan.