Loading...
HomeMy WebLinkAbout270266_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 105105247 PROJECT ADDRESS: 315 W Walnut St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/19/2020 INITIAL REVIEW 12/6/2020 EXPIRATION 5/18/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Carlos Bustamante 3. TEL: (714)640-1978 FAX: VALUATION: $25,000.00 EMAIL: Carlos@ULProperties.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Sheet CSAdd new ceiling-drop framing construction under Project Scope.Add new rafter-ties framing under Project Scope.Add 2019 California Residential Code (CRC) under general note number 1.Provide energy documentation.Sheet ID-1.0On the interior-wall-elevation drawing, specify sheathing material, thickness, and nail spacing.On the interior-wall-elevation drawing, graphically show the shear-transfer connection at the double-top plates and roof sheathing.On the floor plan, identify new shear wall at the portion of the wall between bedroom one and the built-in hutch.Sheet ID-2.0Provide the following structural detailing on Section drawing:Double top-plates to ceiling at hallway.Rafter-tie to full-height wall.Top of full-height wall to roof sheathing.On the Section drawing, provide ceiling height dimension at the hallway.