Loading...
HomeMy WebLinkAbout270350_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105279 PROJECT ADDRESS: 3130 S Harbor Blvd Unit# 210 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/23/2020 INITIAL REVIEW 12/5/2020 EXPIRATION 5/22/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Mike Wilson 3. TEL: (949)798-7321 FAX: VALUATION: $297,050.00 EMAIL: M.wilson@interiorarchitects.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) Sheet A-1.0. Note #102. Provide wall construction detail to fill out the corridor wall. Specify in the wall assembly whether the corridor wall is fire-rated. Sheet A-1.0 and AN-6.0. At the new door (210.04) leading to the corridor, it appears the door will reduce the required width by more than 7”. Recessed door at the corridor may be needed. Doors, when fully opened, and handrails shall not reduce the required width by more than 7”. Doors in any position also shall not reduce the required width by more than one-half. CBC Section 1005.7.1. Sheet A-1.0. Note the following on the plans: “The means of egress, including the exit discharge, will be illuminated to a level of not less than one foot-candle at the walking surface at all times the building space served by the means of egress is occupied”. Sheet A-1.0. Note on the plans: “Exit signs shall be internally or externally illuminated at all times and shall be connected to an emergency power system (batteries, unit equipment or an on-site generator) that will automatically illuminate the exit signs for a duration of not less than 90 minutes.” Sheet A-1.0. Door #210.01 and #210.04 equipped with a key operated locking device shall have a readily visible, durable sign posted on the egress side adjacent to the door stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. The sign shall have one-inch high letters on a contrasting background.