Loading...
HomeMy WebLinkAbout267318_2_Corrections.docxPLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101104281 PROJECT ADDRESS: 2010 W Chestnut Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/11/2020 INITIAL REVIEW 10/5/2020 EXPIRATION 2/7/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Paul Le 3. TEL: (714)582-3909 FAX: VALUATION: $115,000.00 EMAIL: permit@southwestsunsolar.com FLOOD ZONE: X-0602320257J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)The Unirac Roof mounted Ballasted layout shall be designed by a California registered civil engineer or licensed architect. The roof mounted ballasted layout plan shall be stamped, signed, and dated by a California registered civil engineer or licensed architect. Note: Currently the plan was stamped for “gravity check only”. Please check roof framing system in accordance with Section 1604.4 for deflection; and 1611 for ponding.