Loading...
HomeMy WebLinkAbout269721_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102105088 PROJECT ADDRESS: 215 1/2 E Chestnut Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5894 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/28/2020 INITIAL REVIEW 11/6/2020 EXPIRATION 4/26/2021 RECHECKS: 1.12/2/2020 PROJECT APPLICANT CONTACT PERSON: 2. Juan Pomalaza 3. TEL: (949)742-2395 FAX: (714)866-4164 VALUATION: $30,000.00 EMAIL: juancapomalaza@gmail.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. Police Department approval on the corrected/final set of drawings (647-5840). Public Works Agency approval (647-5039). School District Structural Comments: Detail 15/S3 called out at the interior structural wall was not applicable. Please provide detail to show ceiling and roof rafter run perpendicular to wall. 2nd Review Comment: Detail 15/S3, Shear Transfer detail – Please revise detail to show roof rafter run perpendicular with wall (not parallel as shown).