Loading...
HomeMy WebLinkAbout269481_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105012 PROJECT ADDRESS: 1123 N Freeman St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/21/2020 INITIAL REVIEW 11/12/2020 EXPIRATION 4/19/2021 RECHECKS: 1.12/8/20 PROJECT APPLICANT CONTACT PERSON: 2. Leticia Portocarrero 3. TEL: (714)721-3412 FAX: VALUATION: $29,000.00 EMAIL: lettyp67@yahoo.com FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Structural comments: 2nd Review Comment: The response was incomplete the following comments are required. Ceiling beams 2 and 4 – Please revise Roof Framing plan to clearly show support location of beam. It was not clear on plan how long the beams are span. Provide detail for support at each end of the beam. Please coordinate with beam support locations and provide pad footing as necessary. Provide detail connection of beam supporting beam.