HomeMy WebLinkAbout270626_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101105366
PROJECT ADDRESS:
2416 S Broadway
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
F-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/4/2020
INITIAL REVIEW
1/13/2021
EXPIRATION
6/2/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Randall Jepson
3.
TEL:
(714)288-8700
FAX:
(714)272-9000
VALUATION: $17,000.00
EMAIL:
randy@pjparch.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- School District Compliance Certificate; a copy of the building permit application, signed by the plan check
engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSheet A1.1:Please provide Sheet Index. Subject Building(s) Data: Please include the existing tilt-up building information: Occupancy groups, Type of Construction, and Floor area. Please Building Code Analysis for the allowable building area in compliance with Chapter 5. Buildings on the same lot shall comply with Section 705.3 or Exception 1 may be considered. Show distance setback between the property lines and buildings. Fire-resistance rating requirement for the exterior wall based on the fire separation distance shall comply with Table 602. On the plan, please show fire-rated wall and provide wall construction for the fire-rated wall assembly. No openings shall be permitted where exterior wall located less than 3-ft from the property line. Table 705.8. Parapets shall be provided on exterior walls of the building per Section 705.11. Parapets construction shall comply with Section 705.11.1. The 79 sq.ft and 103 sq.ft. sheds: the building shall not build over a property line. Fire-rate wall and parapet are required at wall adjacent to the property line. Accessibility RequirementOn the plan, please provide accessible parking stall and an accessible path of travel from the accessible parking to the building accessible primary entrance. Parking spaces shall comply with 11B-502. At least one van parking space is required. Show provide an accessible route from the existing building to the proposed building. Accessible route shall be 5% slope maximum, 2% cross-slope and 48” wide minimum. Detectable warnings shall be provided where required per Section 11B-247.1.2. On the plan, please provide/show restrooms and show restrooms in compliance with Chapter 11B, Division 6 for persons with disabilities. Provide restroom plans and details. Plan review will continue at time of resubmittal. Sheet A1.2:On the plan, please provide accessible parking stall and an accessible path of travel from the accessible parking to the building accessible primary entrance.Dust collection tower located on the adjacent property: Please relocate the dust collection tower to the same lot with the serving building. Mechanical ducts and equipment shall not cross a property line. Detached metal building: Please provide floor plan for the metal building show walls, wall openings, dimensions, etc. Sheet A2.1B:Please provide structural details at the following grid lines: Line A (between 2 and 3); line B (between 2 and 3); line D (between 1 and 2); line E and F (between line 1 and 2); line 1, etc. There were two line E – please revise gridline accordingly. Please provide detail to show attachment/connection (fasteners) from metal roof panel to TS 2x2 purlins, to 8x2x14 ga girders to 4x4 beam, to post/columns. Provide calculation and details for moment connection (beams to columns). Provide foundation plan for the detached structure. Provide pad footing at each supporting column. Sheet A2.1A:Please show floor dimensions for the attached structures.