Loading...
HomeMy WebLinkAbout270656_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105381 PROJECT ADDRESS: 3400 W Segerstrom Ave PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/8/2020 INITIAL REVIEW 12/20/2020 EXPIRATION 6/6/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Denise Hollman 3. TEL: (562)244-1748 FAX: VALUATION: $300,000.00 EMAIL: denise.hollman@eqdepot.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Drawings must be to scale and be on 18” x 24” minimum sheets. - Provide a Vicinity Map showing project location - Show North Arrow on Plan Views - Provide a fully dimensioned Floor Plan Provide the following: - Show all property lines of record on the site plan. Show compliance with CBC Section 704 and CBC Tables 601, 602, and 704.8.Please clarify if there are 2 buildings or one building ,is there any demising wall.Occupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of material stored on the storage racks.Occupancies using hazardous materials are subject to special requirements. It is the applicant’s/owner’s responsibility, PRIOR TO SUBMITTAL, to make this known to the Building, Planning, or Fire Departments.Show all the exit doors on the site plan.Provide complying exiting plan for the area. CBC Section 1009.2, Continuity and components. Each required accessible means of egress shall be continuous to a public way and shall consist of one or more of the following components: Accessible Routes, Stairways, Elevators, Horizontal Exits, Ramps, or Areas of Refuge.EXIT ACCESS. That portion of a means of egress system that leads from any occupied portion of a building or structure to an exit. CBC Sections 1016.Provide number of exits required by CBC Sections 1006.Separation of exits must comply with CBC Section 1007.1.1. The length of a common path of egress travel in Group B, F and S occupancies shall not be more than 100’, provided that the building is equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1. CBC Section 1028.5, Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way.Exit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed.CBC Section 1707.6, Storage racks and access floors. Periodic special inspection is required during the anchorage of access floors and storage racks 8’ or greater in height in structures assigned to Seismic Design Category D.Note on the drawings locations and inscriptions of 50 square inch minimum size permanent plaques installed in conspicuous locations, showing the maximum permissible unit load in clear, legible print.Lower portions of posts exposed to damage by forklift trucks or other moving equipment shall have protective devices. If not so protected, at the option of the building official, the rack structure may: (1) be designed to maintain its full design load capacity at allowable stresses with the exposed post capacity reduced by one-half or (2) be designed to maintain its full design load capacity at 50 percent increased allowable stresses with the exposed post assumed to have no carrying capacity.Detail 5F/ A referenced on sheet B is not included.Call 6 “ slab on the drawings per calculation.Please identify Design and Analysis methods for use of slab on grade as Foundation.Provide design assumption per LABC1806, P/BC 2008-100Provide structural observation requirement on drawings per LABC 1806, P/ BC 2008-100.