HomeMy WebLinkAbout269653_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101105064
PROJECT ADDRESS:
4426 W First St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V A
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/27/2020
INITIAL REVIEW
12/9/2020
EXPIRATION
4/25/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
James Gartner
3.
TEL:
(714)560-9210103
FAX:
VALUATION: $100,000.00
EMAIL:
jg@jgartner.com
FLOOD ZONE: A-0602320256J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please return marked up set of drawings with corrections.Please note on plan: This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)Sheet TS-1:Project Data: Please provide the following informationBuilding area of the existing building. Total number of new vacuum stationsNumber of new overhead awningsSheet A1.1:Overhead awning: Please show the minimum clear height of the overhead awning. Minimum 98” (8’-2”) clear height is required above the accessible vacuum station. In addition to the accessible parking vacuum station, an accessible parking space is required for general public/customer and/or employee. Please coordinate and revise plans accordingly. Accessible Van parking stall shall comply with Section 11B-502.2 and 11B-502.3. On the plan, please show existing accessible restroom.