Loading...
HomeMy WebLinkAbout271320_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105579 PROJECT ADDRESS: 2222 1/2 W San Lorenzo Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/5/2021 INITIAL REVIEW 2/3/2021 EXPIRATION 7/4/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kevin Le 3. TEL: (508)826-5451 FAX: VALUATION: $36,000.00 EMAIL: kevin.imk.inc@gmail.com FLOOD ZONE: X-0602320259J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Sheet T1.0: Please include the half (1/2) address for the proposed ADU. Occupancy type: Please correction the occupancy group to R-3 and U. Please specify if the existing house is equipped with automatic fire sprinkler or not? Scope of work: Please include the window & door replacement of the existing main house. Photovoltaic (PV) system is required. Please provide the following note on the plan – please remove statement “If Required”, and add note, PV system shall be permitted and installed prior to final inspection sign off. Sheet SP.0: Site plan: For clarity, please omit/remove delta number and clouds on the submittal. Please show distance between proposed ADU and existing patio cover. Sheet SP.2: Site Drainage plan: Please complete the attached ADU Grading Exemption Checklist and reproduce onto the plan. Drainage plan was incomplete. A site drainage plan prepared by a California registered professional civil engineer shall be provided with the following minimum information, but not limited to: Plan(s) shall be stamped, signed and dated by a California registered civil engineer Location of all existing and proposed structures, property lines, right-of-way lines, and easements, including dimensions and setbacks Drainage slopes and flow patterns Drainage system such as swales, french drains, water collection and disposal system, etc. Drainage plan shall indicate how the site grading or drainage system will manage all surface water flows to be diverted away from buildings (new and existing) and adjoining property lines, in accordance with all applicable codes The grade shall fall not fewer than 6 inches within the first 10 feet from the foundation wall. Where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, drains, or swales shall be constructed to ensure drainage away from the structure. Impervious surfaces within 10 feet of the building foundation shall be sloped not less than 2 percent away from the building. Sheet A1.0: Door and Window Schedule: Please increase font size so it can be legible. Please show door landing. Landing shall be minimum 3-ft measured in the direction of travel, and width equal to door opening. Sheet A1.1 & A2.0: Sheet A1.1: Cool roof is required. On the plan, please specify CRRC number of the roofing material. Sheet A2.0: Please provide at least two (2) roof vents for cross-ventilation. Sheet A3.0: On the plan, please specify U-factor and SHGC for the replaced windows. Sheet EP.0: Please specify on the plan: Mechanical, Electrical, Plumbing are not part of this plan review and approval. MEP are subject to field inspection. Please provide smoke alarm inside the bedroom. Please provide carbon monoxide alarm outside of the sleeping room. Please provide whole-house vent required by the California Energy Code.