HomeMy WebLinkAbout271647_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105680 PROJECT ADDRESS: 2120 E McFadden Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II B OCCUPANCY CLASSIFICATION(S): U, M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/19/2021 INITIAL REVIEW 2/7/2021 EXPIRATION 7/18/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jimmy Toetz 3. TEL: (213)201-2528 FAX: (213)381-5117 VALUATION: $500,000.00 EMAIL: jimmy.toetz@fiedlergroup.com FLOOD ZONE: X-0602320277J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Grading permit Sheet CS1.0:Equipment Enclosure: Please clarity occupancy classification. Hydrogen fuel gas room located outside and separated from areas of the building may not classified as group H (Section 421.3); otherwise, H-2 occupancy shall be provided with fire separation distance in accordance with Section 415.6.1.2. Please note on plan: All hydrogen fueling equipment shall be listed and approved Hydrogen Equipment. Sheet C2.0:Keynote # 1.8B: Accessible parking sign – Please reference to sheet C6.0 for sign detail. Keynote #1.31: Accessible parking stall – Please reference to detail C6.0 for accessible parking detail. (11B-502.2)On the plan, please provide/show van accessible parking stall in compliance with section 11B-502.2. Car and van parking spaces shall be 216 inches long minimum. Van parking spaces shall be 144 inches wide minimum, shall be marked to define the width, and shall have an adjacent access aisle complying with Section 11B-502.3.Van parking spaces shall have access aisles located on the passenger side of the parking spacesAccess aisles shall adjoin an accessible route.On the plan, please provide/show an accessible route from the accessible parking stall to the building primary entrance. Accessible route shall be 5% maximum slope measured in the direction of travel, and 2% maximum cross-slope. On the plan, please show/provide detectable warning (truncated dome) along the path of travel. (11B-247)Please show an accessible path of travel to the proposed canopies/dispensing area. Sheet C5.1: Please provide elevation of the hydrogen dispenser. The dispenser operable parts shall be accessible to persons with disabilities. Please show compliance with Section 11B-309. (11B-228)Sheet C6.1: Light pole footing detail was provided – On the plan, please show location of light poles, and include light poles in the job description and permit application. Specify on plan how many light poles are proposed. Provide structural calculation. Sheet A1.0: Canopies under which fuels are dispensed shall have a clear, unobstructed height of not less than 13 feet 6 inches (4115 mm) to the lowest projecting element in the vehicle access area. Please coordinate and revise elevations accordingly. Structural Review Comment: Sheet S0.0, General note #2: Please update code edition to 2019 CBC edition. Please provide specification of the Station modules and valve panel, including maximum height and weight. Sheet S1.0: Provide details and specification of the fueling storage rack. Please provide elevation of the Station modules and provide structural support/anchorage (see equipment plan on sheet C5.0 location). Details shall be clearly cross-referenced onto the plan. Please provide elevation of valve panel elevation and structural support/anchorage. (See equipment plan on sheet C5.0 for location). Details shall be clearly cross-referenced onto the plan. Fence posts: For clarity, please show placement (spacing) of posts so that it can be easily located. Specify Special inspection is required for concrete strength fc’ greater than 2500 psi. Sheet S1.2: 13-feet 6-inches clear height fuel canopy is required. Please revise calculation and details, including footing, accordingly. On the plan, please clearly show cantilever beam HSS 12x12x4.Provide calculation for the connection (welding between HSS beam and STD pipe column. Specify Special inspection is required for concrete strength fc’ greater than 2500 psi; and for field welding. Provide structural calculation and detail for the hydrogen dispenser. Storage Rack: 1.Please provide seismic analysis for the hydrogen storage rack, use I = 1.25.Review of Soil report by Salem: Please note on plan the following notes: Soil Management Plan (SMP) is recommended to be prepared and distributed to construction personnel. Prior to fill placement, Salem Engineering Group, Inc. should inspect the bottom of the excavation to verify the fill condition. Salem Engineering shall be present at the site during site demolition and preparation to observe site clearing/demolition, preparation of exposed surfaces, etc. Salem Engineering should observe foundation excavations prior to placement of reinforcing steel or concrete. Final foundation plan and details shall be submitted to the geotechnical engineer of record (Salem Engineering) for review and approval. The geotechnical engineer of record shall “review” stamp the plan for general conformance with the soil report recommendation.