Loading...
HomeMy WebLinkAbout270617_2_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105363-64 PROJECT ADDRESS: 1417 N Bristol St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/3/2020 INITIAL REVIEW 12/21/2020 EXPIRATION 6/1/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Anthony Palma 3. TEL: (949)584-1398 FAX: VALUATION:$1.00 EMAIL: antdipper@gmail.com FLOOD ZONE:X-0602320144J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.First Plan Check Comment:Clearly indicate the location of proposed CMU walls on the site plan.Second Plan Check Comment: Per snap shot above, it is unclear where the wall begins and where it ends.Please highlight the starting point and end of the CMU walls.Sheet 3 of 7: Specify the size of longitudinal rebars on detail 2.First Plan Check Comment:On detail two, the footing shall not protrude across the property line. Revise detail.Second Plan Check Comment: A property line does not shift vertically in the air. Design an L-shaped footing on a zero-lot line or specify minimum distance from the property line to the face of the wall.