Loading...
HomeMy WebLinkAbout271839_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105733 PROJECT ADDRESS: 2234 N Poplar St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/26/2021 INITIAL REVIEW 1/30/2021 EXPIRATION 7/25/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. William Chung 3. TEL: (562)809-0448 FAX: VALUATION: $90,000.00 EMAIL: Signplus123@yahoo.com FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. PLAN CHECK COMMENTS: Fill out the Part I of the BUILDING PERMIT SCHOOL FEE WORKSHEET form and email back to building plan reviewer Wayne Lee at wlee@santa-ana.org. This form is attached in this plan check comment list. Resubmit 3 corrected sets of plans. Provide ICC ESR number for roof covering. The ICC ES AC438 is not the approved test report for the shingle roof covering. STRUCTURAL Sheet A-2. Provide missing detail: 2/D1 on plan. Sheet A-2. Grid C. Provide shear wall sill plate anchor detail to the foundation. Detail 13/D1 does not apply. Sheet A-2. Grid C. Provide holdown anchorage detail. Detail 2/D2 does not apply. Sheet D-1. Detail 18. Clarify how the Simpson post base “PB” installed at the wood column to the2x6 wood plate and provide positive anchorage from 2x6 wood to concrete footing. If the post base is installed directly to new concrete footing and to provide 1” standoff, consider to use “PBS” instead of “PB”.