HomeMy WebLinkAbout270915_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101105462
PROJECT ADDRESS:
515 E Dyer Rd
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, S-1, S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/15/2020
INITIAL REVIEW
1/2/2021
EXPIRATION
6/13/2021
RECHECKS:
1.1/24/2021
PROJECT APPLICANT CONTACT PERSON:
2.
Julie Armstrong
3.
TEL:
(541)389-9659
FAX:
VALUATION: $260,165.00
EMAIL:
jarmstrong@eeimt.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Public Works Agency approval (647-5039)Sheet SH-01:Please clarify information showed as proposed overhead doors, proposed doors, proposed TDR entrance, proposed removed dock cart, proposed demising wall, etc. Please omit information if they are not part of this permit application. 2nd Review Comment: Plan still showed “Proposed overhead” doors and entrances – Please omit proposed openings if they are not part of this permit application. Please coordinate with sheet 001 as well. 3rd Review Comment: Sheet SH-01 – Information on sheet SH-01 was turned off. It was just a blank sheet; please provide sheet SH-01 with applicable information. Reminder: Please clearly cross-reference to applicable details for proposed storage racks and crossover platforms so that it would be clearly reflect the scope of work. General: Prior to resubmitting plans to Building Safety for review, the applicant should review the plans sets for complete and legible. Additional plan check fee will be required after the third (3rd) plan review and thereafter.