HomeMy WebLinkAbout271100_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101105529
PROJECT ADDRESS:
2840 S Croddy Way Unit# A
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/22/2020
INITIAL REVIEW
1/1/2021
EXPIRATION
6/20/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Sami Pakbaz
3.
TEL:
(626)727-8900
FAX:
VALUATION: $400,000.00
EMAIL:
spakbaz@infrastructurearchitects.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- OC Sanitation District (714) 593-5756
PLAN CHECK COMMENTS:Add new fences and sliding gates into building permit. (e.g. new fences and sliding gates note #152 through #155 on the site plan).Sheet A0.5. Provide illuminated exit signs at the exit access door and the corner in the corridor along the exit route from retail space (room #103) to the exit door (door #110). Refer to red marks on plan.Sheet A1.0. Coordinate with the structural engineering drawings and cross-reference structural detail for fence posts and their footing details into the notes #152 and #153. Sheet A1.0. Provide accessible gate design and detail on plan and make cross-reference to the note #157.Sheet A9.0. Add note to the door schedule that “Power-operated sliding doors shall comply with BHMA A156.10”. (CBC 1010.1.4.2).Sheet A9.0.All provisions of Section 1008.1.4.3 for horizontal sliding door must be listed on the plans.See red marks on the drawings.GREENAlteration projects with valuation of $200,000 or above shall meet all of the applicable requirements of 2019 CalGreen, Divisions 5.1 through 5.5. Fill out “GRN-03_CalGreen Non-Residential Checklist form” and incorporate it into the drawings.STRUCTURALProvide structural calculation for roof top equipment anchorage design. Design equipment connection and supporting roof framing members.Provide calculation for post design for the 8 feet fence wall. Specify specification, material and spacing of the fence post in detail 20/SD1.