Loading...
HomeMy WebLinkAbout271120_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105538 - 39 PROJECT ADDRESS: 1520 1/2 W Second St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/22/2020 INITIAL REVIEW 1/14/2021 EXPIRATION 6/20/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Earnest Little 3. TEL: (562)686-1007 FAX: VALUATION: $100,000.00 EMAIL: earnest.midway@gmail.com FLOOD ZONE: X-0602320257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. -Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Sheet CS: On the plan, please specify occupancy groups (R-3 / U). Please note on the plan: Mechanical, Electrical, and Plumbing are not part of this plan review and approval. MEP are subject to field inspection. Sheet A2: Main house: Bedroom adjacent to the living room – Please provide egress window. The escape opening shall have a minimum net clear opening of 5.7 sq. ft. with 24" minimum net clear height and 20" minimum net clear width. Escape window shall have a finished sill height not more than 44" above the floor. At grade-floor is allowed to have escape opening of 5.0 sq. ft. (R310.1) Main house: Please provide smoke and carbon monoxide alarm outside of bedroom adjacent to the kitchen. ADU: Please relocate the AC condenser away from the bedroom window opening. ADU: Sliding door #4 – please specify tempered glass. ADU: Please provide/show whole-house vent for the proposed ADU. Sheet A3: Elevations: Please coordinate elevations with window schedules. Elevations showed sliders vs. single hung as specified on the window schedule. Please coordinate and revise plans accordingly. Please show/provide R-insulation at roof per Title 24 calculation (R-13 + R-30).