Loading...
HomeMy WebLinkAbout271465_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105628 PROJECT ADDRESS: 1251 E Dyer Rd Unit# 150 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/14/2021 INITIAL REVIEW 1/23/2021 EXPIRATION 7/13/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Michael Parr 3. TEL: (949)608-3748 FAX: VALUATION: $630,000.00 EMAIL: mparr@saaia.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings (667- 3600)PLAN CHECK COMMENTS:For next plan check, please submit the revised plans at the building counter to add the new exterior improvement at the steps, ramp and landing area on the north side of the building to the building permit.Sheet A-0.1. Add the new exterior improvement at the steps, ramp and landing area on the north side of the building to the description of the scope of work.Sheet A-0.1. Revise key plan to provide following information:Revise the scope of work area to include the site improvement on the north side of the building.Show suite number and square footage of each suite in the building.Identify the fire-rating of the demising walls between the suites.Sheet A-0.5B. Provide illuminated exit signs at the hallway #111 and mother’s room #104 on the egress plan (A-0.5B) and on the reflected ceiling plan (A-4.0). See redmarks on plan.Sheet A-0.5B. Provide tactile sign on the egress side of the exit access door. See redmarks on plan.Sheet A-0.5B. Show total travel distance on the egress system through exit door #1. (maximum 250 feet)Sheet A-0.5B. Show egress path from exit door #4 to the building exit with total travel distance.Sheet A-0.5B. Show total number of the occupants at each exit / exit access door (exit #1 through exit #4).Sheet A-0.7a. Detail 7. Provide dimensions between partition walls of the accessible restrooms.Sheet A-0.9. Detail 2. Provide intermediate handrails at the 18 feet wide step. Provide handrail details on the drawings showing compliance with CBC Section 1011.14, 1014, and 11B-504.6. - Stairways shall have handrails on each side. - Every stairway required to be more than 88” in width shall be provided with not less than one intermediate handrail for each 88” of required width. Intermediate handrails shall be spaced approximately equally across with the entire width of the stairway. - Handrails shall be 34 to 38” above the nosing of treads. - Handrails shall extend a minimum of 12” beyond the top nosing, and shall extend a minimum of 12” plus the tread width beyond the bottom nosing. - Ends of handrails shall be returned or shall terminate in newel posts of safety terminals. - Handrails projecting from a wall shall have a space of 1½” between the wall and the handrail. - The handgrip potion of handrails shall not be less than 1¼” nor more than 1½” cross-sectional dimension or the shape shall provide an equivalent gripping surface. The handgrip portion of handrails shall have a smooth surface with no sharp corners. Any wall or other surface adjacent to the handrail shall be free of sharp or abrasive elements. Edges shall have a minimum radius of 1/8”.Sheet A-2.0. Provide dimensions to locate all interior partition walls.Sheet A-2.0. Note the following on the plans: “The means of egress, including the exit discharge, will be illuminated to a level of not less than one foot-candle at the walking surface at all times the building space served by the means of egress is occupied”.Sheet A-2.0. Note on the plans: “Exit signs shall be internally or externally illuminated at all times and shall be connected to an emergency power system (batteries, unit equipment or an on-site generator) that will automatically illuminate the exit signs for a duration of not less than 90 minutes.”CALGREENPlans shall indicate method of verification of compliance with all CALGreen requirements. Third party or other methods shall demonstrate satisfactory conformance with mandatory measures. Fill out and incorporate City's Mandatory Measures Checklist “GRN-03_CalGreen Non-Residential Checklist” copies onto plans.STRUCTURALProvide page number on each page of the structural calculation.Sheet S2.2. At the roll-up door opening, clarify steel beam dimensions and thickness on the framing plan and detail 4/S1.2.Sheet S2.2. Provide missing connection detail at the HSS beam in the large gym room.