Loading...
HomeMy WebLinkAbout270682_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105391 PROJECT ADDRESS: 1030 1/2 W Nineteenth St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/7/2020 INITIAL REVIEW 1/7/2021 EXPIRATION 6/5/2021 RECHECKS: 1.3/2/2021 PROJECT APPLICANT CONTACT PERSON: 2. Leslie Olivares 3. TEL: (714)661-9466 FAX: VALUATION: $30,000.00 EMAIL: lrojas21@gmail.com FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Sheet A-1: Site plan: Please show distance between the property line and the existing building (proposed ADU). Exterior walls located less than 5-ft from a property line shall be of one hour construction. 2nd Review Comment: Please specify existing exterior finish of the exterior wall. No projection beyond 2-ft of the fire separation distance. Revise elevation as necessary. 2nd Review Comment: Please revise plan to show no projection at the South wall. Cut and modify existing roof projection on the existing garage to show no eave overhang. Revise elevations and detail 7/A-4. Sheet A-2: Please provide an emergency escape opening/window. The escape opening shall have a minimum net clear opening of 5.7 sq. ft. with 24" minimum net clear height and 20" minimum net clear width. Escape window shall have a finished sill height not more than 44" above the floor. 2nd Review Comment: 3’x2’6” SL window does not meet minimum opening as required above. Please coordinate and revise plan accordingly.