PLAN CHECK NO:
101105280
PROJECT ADDRESS:
2042 N Olive St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/23/2020
INITIAL REVIEW
12/6/2020
EXPIRATION
5/22/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Neda Vakili
3.
TEL:
(949)215-7744
FAX:
VALUATION: $120,000.00
EMAIL:
neda@acmbuilder.com
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper. The address of the building, and the name and address of the owner(s) and person(s) preparing the plans are required on the first sheet of the plans. (CBC 107)
Provide building information on plans:
- Occupancy type: R3 / U
- Construction type: Type V – B
Show the North arrow on the plans and centerline of labeled street(s) and alley.
Provide eave / overhang / projection setback to all property lines.
Please rename elevations directions, North , South, West, East to match actual condition.Basements, habitable attics, and every sleeping room in dwelling units must have a window or exterior door for an emergency exit, sill height not more than 44 inches above the floor, 5.7 square feet of openable area, 24 inches clear opening height, 20 inches clear opening width and shall open directly into a public street, alley, yard, or exit court. Windows ______ do not comply. (CRC R310.1-R310.1.3) ( For all bedrooms)
CAUTION: Using minimum clear openable height with the clear openable width will yield only 3.3 square feet and not the minimum 5.7 square feet required. Be especially careful with double-hung windows. Also, when the emergency escape window is below ground level refer to CRC Section R310.2 for additional requirements. Show 30-inch clear width for water closet compartments and 24-inch clearance in front of a water closet. Show location of heating equipment on the plans. (CRC R303.8)All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in the following locations:
- In each sleeping room.
- Outside each separate sleeping area in the immediate vicinity of the bedrooms.
- When more than one smoke alarm is required to be installed within an individual dwelling
unit the alarm devices shall be interconnected in such a manner that the actuation of one
alarm will activate all of the alarms in the individual unit.All new construction, Interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000,, an approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel-burning appliances are installed and in dwelling units that have attached garages shall be provided with carbon monoxide alarms (CRC R315)
- Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for
which the permit was obtained. Carbon monoxide alarms required by Sections R315.1 and
R315.2 shall be installed in the following locations: ________.
- Outside of each separate dwelling unit sleeping area in the immediate vicinity of the bedroom(s).
- Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or
within a sleeping unit the alarm shall be interconnected in a manner that activation of one alarm
shall activate all of the alarms in the individual unit.
Exception:
Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes, there is no access by means of attic, basement or crawl space, and no previous method for interconnection existed.Shower compartments and walls above bathtubs with shower heads installed shall be finished with a smooth, nonabsorbent surface to a height of not less than 72” above the floor. (CRC R307.2)Glass enclosure doors and panels must be labeled Category II. Swing door outward. Net area of shower receptor shall be not less than 1,024 sq. in. of floor area, and encompass 30-inch diameter circle. (CPC411.7)Bathrooms, laundry rooms, water closet compartments and similar rooms shall be mechanically ventilated in accordance with the CMC.The minimum width of hallways shall not be less than 36”. (CRC R311.6) Glazing in swinging, sliding, and bifold doors 9 square feet or less shall be a minimum category classification of I (CPSC 16 CFR 1201) and II (CPSC 16 CFR 1201) when more than 9 square feet or sliding. (Table R308.3.1 (1), R308.3 (1)) Glazing within 24” arc of either vertical edge of the door and less than 5’ from the walking surface shall be safety glazed. (CRC R308.4 (2)) Provide landing at all sliding doors.Provide detail of roof construction assembly. (CRC 902.1) Specify ICC approval number and weight per square foot for tile and special roof coverings. (CRC R905.3.4 and R905.3.5) Callout attic vent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)The total net free ventilating area shall not be less than 1/150or 1/300 when a Class I or II vapor barrier is installed on the warm-in-winter side of the ceiling. (CRC R806.2) Show exterior wall construction assembly. A minimum of one layer of No. 15 asphalt felt, free from holes and breaks, complying with ASTM D 226 for Type 1 felt shall be applied over studs of all exterior walls. Specify that two layers of Grade D or 60 minute Grade D paper shall be applied over all wood base sheathing. (CRC R703.2) Specify a minimum 0.019” (No. 26 galvanized sheet gage) corrosion-resistant or plastic weep screed located below foundation plate line and 4 inches above grade on all exterior stud walls or 2-inches above paved areas. (CRC R703.6.2.1)
Submit engineering calculations for vertical and lateral loads prepared by a registered Civil, Structural Engineer or Architect. Additional Structural Corrections may apply.
Provide complete roof framing plan, with complete construction detail.
Roof plan, doesn’t match roof framing plan.
Provide beam/ header for all openings over 4’.( with calculation)
Provide support at the family room, in lieu of removing exterior wall.
Show how existing roof at new master bedroom will be supported when the exterior walls removed.
On the drawings, provide Nailing Schedule in conformance with CRC Table R602.3(1).
Add note on foundation plan: All hold downs must be tied in place prior to foundation inspection.
3”x3”x.229” steel plate washers are required on all anchor bolts in a braced wall line. (CRC R403.1.6.1)
Specify that foundation sills shall be pressure-treated or foundation grade Redwood. (2304.11.2.2)
Provide a weep screed for stucco at the foundation plate line a minimum of 4 inches above the earth or 2 inches above paved areas. (2512.1.2)
Post-beam connections must be detailed on the drawings ensuring against uplift and lateral displacement (2304.9.7)
Sill plates supporting shear walls with lateral loads greater than 350 pounds/foot require a 3-inch nominal or greater member. (T2306.3, Footnote i)
Detail the shear transfer connections which transfer lateral forces from horizontal diaphragms through intermediate elements and shear walls to the foundation. (1603)
Detail how the interior shear walls are connected to the roof/floor diaphragm(s). (1603)
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.
Clearly identify all design assumptions & load criteria on the plans. As a minimum:
- Dead Loads of roof/ceiling, floors, exterior/interior walls (R301.2.2.2.1);
- Live Loads for roof, attics with limited storage, attics without storage, habitable attics and attics
served with fixed stairs, floors, and balconies/decks, and stairs per Tables R301.5 & R301.6;
- Wind Loads per Section R301.2.1and wind exposures per Section R301.2.1.5;
- Seismic Loads per Section R301.2.2;
- Local Jurisdiction Design Criteria per Table R301.2(1)
Provide an accurate and complete listing of required special inspections pursuant CBC 1704 specific to this project. This should appear in prominent position on the cover sheet of the plan. Alternatively, provide a clear note in a prominent position on the cover sheet which states what sheet of the plans the list of special inspections specific to this project may be found. See exceptions for accessory structures to R-3 and U occupancies. (CBC 1704.1)
Specify the size, spacing and direction of rafters.
A ridge board, valley and hip members not less in depth than the cut end of the rafter is required. It shall be a vertical load-bearing member when roof slope is less than 3 inches in 12 inches. CRC R802.3
Specify the header size at door, window and other openings over 4 ft wide in bearing walls. CRC Table R804.3.5
Provide details for retrofit shear and tension anchor bolts on plans. Provide calculations as needed
Call out anchor bolt size and spacing on foundation plan. Provide 1/2" diameter embedded 7" minimum at 6' o.c. maximum spacing (4' o.c. for 2 stories). CRC R403.1.6
Detail (and reference location on foundation plan) typical foundation sections for: perimeter walls, interior bearing walls, depressed slabs, foundation common to dwelling and garage, garage entrance, spread and/or post pads.
Show the new concrete slab with detail on the foundation plan.
Cross reference all calculations for joists, beams, shearwalls, etc ... to framing/floor plans.
Specify on the framing plans the shear wall material, thickness, size and spacing of fasteners and sole plate nailing. Call out anchor bolt spacing and hold down hardware on foundation plan.Indicate all compliance measures from the energy compliance documentation on the plans. (i.e., Insulation for sections, U-factors SHGC). Revise door and window schedule or floor plans to show compliance. (T24-1-10.111)Revise framing plans to indicate insulation for walls R=15, ceiling R=30, and raise floor R=19 climate zone 8. Energy calculation shows Tankless water heater , plans show storage tank water heater, please clarify.Please fillout attached SB-407 and copy it on the drawings.