Loading...
HomeMy WebLinkAbout270637_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101105372 PROJECT ADDRESS: 1434 1/2 S Garnsey St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/4/2020 INITIAL REVIEW 1/7/2021 EXPIRATION 6/2/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Alex Cueto 3. TEL: (323)788-1892 FAX: VALUATION: $85,000.00 EMAIL: alex.cueto@sbcglobal.net FLOOD ZONE: X-0602320257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Sheet 1: Please revise plan to use ½ (half) address for the ADU (1434 ½ Garnsey Street). Apply to all sheets. On the plan, please specify minimum 1.64 KWdc Photovoltaic System will be installed prior to building final inspection sign off. A separate permit is required for the Photovoltaic System. Sheet 1-A: Existing House Replaced windows shall be required a separate permit application. Please provide permit application for the replaced windows. Sheet 1-B: Site Drainage plan Please provide designed engineer’s contact information. Provide responsible statement from the engineer for the drainage plan. Please include the engineer signing date. Sheet 2: On the plan, please provide/show whole-house vent. All branch circuits supplying receptacles in residence, except bathroom and garage, shall be protected by a listed arc-fault circuit interrupter (AFCI). Please AFCI receptacles at the kitchen area, in addition to the GFCI. Please provide smoke alarm outside of the bedroom. On the plan, please show building heating source. Coordinate with Title 24 calcuation. Sheet 3: Roofing: Please revise note to specify 2-layers of felt at roof slope less than 4:12 slope. Sheet 4: Foundation plan: Detail 17/4 called out at the front porch post was not applicable. Please revise detail callout to specify 17/5.