Loading...
HomeMy WebLinkAbout274381_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101106479 PROJECT ADDRESS: 1409 E St Gertrude Pl PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/21/2021 INITIAL REVIEW 4/27/2021 EXPIRATION 10/18/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jonathan L Zane 3. TEL: (909)376-7138 FAX: (909)825-7624 VALUATION: $940,000.00 EMAIL: jlzane@roadrunner.com FLOOD ZONE: X-0602320276J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Final plan shall be stamped, signed and dated by the architect of record.Plan was incomplete. Additional comment may be required at time of resubmittal. Sheet C-1: Please note on plan: Every Cannabis Business shall implement adequate ventilation system and odor control filtration measures to prevent odors from inside the cannabis facility from being detected outside the cannabis facility, to include building and the unit.Carbon dioxide enrichment gas detection. A gas detection system shall be provided in rooms and indoor areas in which carbon dioxide enrichment processes are located. Extraction gas detection. For extraction processes utilizing flammable gases as solvents, a continuous gas detection system shall be provided.On the plan, please list all types and quantities of hazardous materials that will be used and/or stored in the building, for each control area. The use of a building or structure, or a portion thereof, that involves the manufacturing, processing, generation or storage of materials that constitute a physical or health hazard in quantities in excess of those allowed in control areas complying with Section 414, based on the maximum allowable quantity limits for control areas set forth in Tables 307.1(1) and 307.1(2), shall be classified as High-hazard Group H occupancy. Submit plans to Orange County Fire Authority for review and approval prior to Building Safety plan review approval. Accessible route & accessible parking: Please provide the following – The pedestrian route shall be separated from the parking area by a continuous concrete curb or guardrail. Provide detectable warning where a walk crosses a vehicular area (parking area). Please show accessible parking spaces and access aisle slope not more than 2% on all directions. Sheet ADA-1 & ADA-2: Applicable Codes on the right side of the Title Block – Please updated code to the current code edition, including the model codes. Details shall be clearly cross-referenced onto the plan. Delete/omit detail that does not apply to the project. Sheet A-1.1: Exterior walls at the Work Area #3: Please provide Wall Legend for the existing CMU Walls. Sheet A1-2: Exterior walls at the Work Area #3: Please provide Wall Legend for the existing CMU Walls.MEP are under separate plan reviews. Please provide/show equipment schedule on the architectural plans architectural review purposes. Please specify the use of space adjacent to the Vendor Entrance. Corridors shall be continuous from the point of entry to an exit, and shall not be interrupted by intervening rooms.Distribution entrance: Corridors shall be continuous from the point of entry to an exit, and shall not be interrupted by intervening rooms. Please coordinate and revise plan accordingly. Doors located along the fire-rated corridor shall be fire-rated and self-closing. Please revise door schedule and specify fire-rating for the doors. Electrical panels located at the fire-rated corridor: Please relocate panels to a utility room. Applicable Codes on the right side of the Title Block – Please updated code to the current code edition, including the model codes.Please show an accessible path of travel between storage area on the right side of the building to the main building area. Please construction details for fire-rated walls and ceiling. Details shall be clearly cross-referenced onto the plan. Provide construction details for new walls. Details shall be clearly cross-referenced onto the plan. Sheet A-2.1: Please revise restroom plan to show water closet to locate at 17”-18” from the adjacent wall, measured to the centerline of the fixture. Please show clear floor dimensions for the water closet. Sheet A-2.2: Please provide ceiling framing plan and details to show ceiling support. Sheet A-3.1: Exit discharge for the storage/grinding rooms on the right side of the building shall have access to the public way. Please show an accessible path of travel and shall be continuous a public way.