Loading...
HomeMy WebLinkAbout271952_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102105764 PROJECT ADDRESS: 332 1/2 S Jackson St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/28/2021 INITIAL REVIEW 2/25/2021 EXPIRATION 7/27/2021 RECHECKS: 1.3/25/21 PROJECT APPLICANT CONTACT PERSON: 2. Ana Obando 3. TEL: (909)264-4433 FAX: VALUATION: $60,000.00 EMAIL: lcdrafting@gmail.com FLOOD ZONE: X-0602320256J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Sheet A-2: Wall between new ADU and existing house shall be protected with one-hour fire-rated construction. Please show one-hour wall and provide construction detail for the one-hour wall assembly. 2nd Review Comment: Detail 1/A-2 provided was insufficient. Please revise detail to provide 5/8” type ‘X’ gypsum board on both sides of wall and show fire-rate wall continue through the ceiling and attic to the roof sheathing. Show blocks and cripple walls. 2nd Review Comment:On the plan, please show 22” x 30” attic access with 30” clear headroom. Sheet A-5: Provide/show ceiling joists over the converted ADU. Additional ceiling joists may be required for ceiling drywall installation, and roof insulation. 2nd Review Comment: Ceiling joists and roof rafters spacing should be match (16” on center?) for structural support. Please coordinate and revise plan accordingly. Please provide shear (braced) wall panels at left wall line of the ADU. Engineering may be required. 2nd Review Comment: Please provide/show hold-down at each end of the new shear wall panel. Please specify hold-down type and provide detail attachment of new hold-down to existing footing.