HomeMy WebLinkAbout275035_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101106658
PROJECT ADDRESS:
1610 E First St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
A-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/12/2021
INITIAL REVIEW
5/28/2021
EXPIRATION
11/8/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Mustafa Bdaiwi
3.
TEL:
(714)673-6611
FAX:
VALUATION: $15,000.00
EMAIL:
mbarchitect@ymail.com
FLOOD ZONE: X-0602320276J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2019 California Building Standards Code with local amendments.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following:
- Disabled access compliance must be shown on the site plan.Show on the plans:
- Area tabulation justifying floor area(s) of building(s) (CBC Sections 503, 505, 506, 507, and 508 and CBC
Table 503)Label and note hourly fire rating of:
- All corridors
- Fire walls
- Fire barriersProvide complying exiting plan for the entire area.Show all exit doors on the site plan.Identify each room and area on the floor plan( with dimension)Provide occupancy separation between A3 and B occupancy .CBC Section 1004.9, Posting of occupant load. Every room or space that is assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.Note on the floor plan the use and occupancy load of each room and/or area. Relate each use to a CBC Table item. Note occupant loads which are the greater number based on CBC Section 1004 and Table 1004.5 or the actual number of occupants.Occupant load is calculated as follows:- Assembly Area _7_PersonsEXIT ACCESS. That portion of a means of egress system that leads from any occupied portion of a building or structure to an exit. CBC Sections 1016.Provide number of exits required by CBC Sections 1006.Egress from a room or space shall not pass through adjoining or intervening rooms or areas, except where such adjoining rooms or areas are accessory to the area served, are not a high hazard occupancy and provide a discernible path of egress travel to an exit.( To the pray room)CBC Section 1022.2.2 Exterior exit doors shall lead directly to the exit discharge or the public way. ( Show on the site plan)CBC Section 1022.1 Exit continuity. Exits shall be continuous from the point of entry into the exit to the exit discharge.CBC Section 1028.5. Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way.Panic hardware shall comply with CBC Section 1010.1.10. Panic hardware shall be provided as required by CBC Section(s):
- An Occupancy with an occupant count > 50. Refer to CBC section 1008.1.8.3, Item 2 for Exception.CBC Section 11B-404.2.7Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction. ( For all doors)Exit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsProvide a continuous walking surface from each exit door to public way.Walks and sidewalks shall have a continuous common surface, not interrupted by steps or abrupt changes in level. Surfaces shall be slip resistant. If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B-247.1.2.5CBC Section 11B-406.5.3 Curb ramps shall comply with CBC Section 11B-406. A level landing 4’ deep shall be provided at the upper end of each curb ramp over its full width to permit safe egress from the ramp surface, or the slope of the fanned or flared sides of the curb ramp shall not exceed 1 unit vertical to 12 units horizontal (8.33% slope).Each lot or parking structure where parking is provided for the public as clients, guest or employees, shall provide accessible parking as required by CBC Section 11B-502.CBC Section 11B-208.2.4 One in every six accessible spaces, but not less than one, shall be served by an access aisle 8’-0” (96”) wide minimum and shall be designated van accessible as required by Section 11B-502 The words NO PARKING shall be painted on the ground within each eight’ loading and unloading access aisle. This notice shall be painted in white letters no less than 12” high and located so that it is visible to traffic enforcement officials. Plumbing facilities shall be provided in accordance with the California Plumbing Code (CPC) Section 412.0 and CPC Table 4-1.Provide plumbing fixture counts.Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 11B-603 and 11B-604and the California Plumbing Code.CBC Section 11B-606.5. Note on the drawings hot water and drain pipes under lavatory shall be insulated.Drinking fountains serving the area of new work shall be accessible. CBC Section 11B-602 and California Plumbing Code Section 406.5.Complete the attached Disabled Accessibility Documentation Form.Structural plan for shoring referenced on sheet A.01 not provided.Provide structural plan and calculation for removing earing wall.