Loading...
HomeMy WebLinkAbout274946_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101106640 PROJECT ADDRESS: 3301 S Harbor Blvd Unit# 113 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/7/2021 INITIAL REVIEW 5/18/2021 EXPIRATION 11/3/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Ed Sapigao 3. TEL: (949)280-4782 FAX: VALUATION: EMAIL: ed@sccgconsulting.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans. All items noted on this plan check report must be addressed. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following prior to building permit issuance: Planning Division approval on the corrected/final set of drawings (647-5804.) Previouslyapproved plans should be submitted to expedite the process.Plan check corrections:Provide a description of the scope of work on the cover page.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.Sheet A2.0. Ceiling plan. Clarify the security chain link fence note at the tenant separation wall between #113 and #114 which does not match detail 8/A3.0. No chain link fence shown in the detail. Also, revise cross-referencing from 9/A3.0 to 8/A3.0.Sheet A2.0. Clarify the equipment shown in the office room 100. It shows on the floor plan which encroaches the door landing and egress route. Clarify the location (at roof?) and if it is new, provide specification and weight of the unit. Structural anchorage design and verify roof framing supporting this unit is required if located above the floor.No plan check redmarks on the plan.END OF COMMENTS