Loading...
HomeMy WebLinkAbout275373_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101106768 PROJECT ADDRESS: 660 E Dyer Rd PLAN CHECK ENGINEER: Lee, WayneTEL:714 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/24/2021 INITIAL REVIEW 6/5/2021 EXPIRATION 11/20/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Anna Marie Bard 3. TEL: (949)341-0920 FAX: VALUATION: $28,500.00 EMAIL: anna.marie@rga-architects.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSPlease indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100)PLAN CHECK COMMENTSProvide existing 2nd floor plan prior to improvement. On plan, provide wall legend to label existing walls to remain vs. existing walls to be removed.Sheet A2-2. Provide structural details to design the top and bottom of the non-bearing partition to support minimum 5 psf lateral force:At the new partition by the stairway, cross-reference the wall assembly details and structural top and bottom connection details into the keynote #21.On all other regular new partition, cross-reference the structural top and bottom connection details into the wall legend.Sheet A2-3. Provide exit signs at the open office area. The exit signs shall be readily visible from any direction of egress travel and clearly indicate the direction of egress travel. (CBC 1013)END OF COMMENTS