Loading...
HomeMy WebLinkAbout275561_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101106820 PROJECT ADDRESS: 1605 N Spurgeon St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/1/2021 INITIAL REVIEW 7/22/2021 EXPIRATION 11/28/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bill Mason 3. TEL: (714)724-3990 FAX: (714)427-0828 VALUATION: $28,000.00 EMAIL: bill@williammasonarchitect.com FLOOD ZONE: X-0602320163J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) Orange County Fire Authority (714) 573-6100Sheet A-1: On the plan, please show location of accessible parking stalls and access aisle. Existing restroom shall be updated to meet the requirement of the current code (2019 CBC), Section 11B Division 6.Note 23: The exterior exit stairway located less than 10-ft from the centerline of the easement; hence, to consider as interior stairway, the exterior wall at the stairway shall be extended vertically at least 10-ft above the top landing. (1023.7)Sheet A-2: Please revise elevations to show one-hour fire-rated exterior wall at the stairway extended 10-ft above the balcony. 2x6 wall stud minimum. Detail 11: Please revise detail to show 7/8” plaster on both sides of wall. Detail 5: Please show 5-ft landing on the pull side of the gate. New gate with no hardware on the outside: Please provide signage indicate exit stairway only and directional signage to the ingress stairway (entrance). Stairway: Please show run and rise dimension.Handrails: Please provide handrail extension at top and bottom landing of stairway. (11B-505.10)Sheet S-1: Structural details – please coordinate with comment #6 above for the new wall height (10-ft above the balcony), revise structural calculation and details accordingly. Design wall and footing for out-of-plane loads.