Loading...
HomeMy WebLinkAbout274611_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101106548 PROJECT ADDRESS: 2302 3/4 S Raitt St Unit# WCC01 PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/28/2021 INITIAL REVIEW 5/12/2021 EXPIRATION 10/25/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kim Ice 3. TEL: (760)650-6268 FAX: VALUATION: $30,000.00 EMAIL: kice@infinigy.com FLOOD ZONE: X-0602320259J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1). Please provide complete detail to show how the new Radom will be supported by the pole. To pick up the marked –up plan, please contact the plancheck engineer for pick up appointment. To resubmit your drawings , you may drop them off Mon – Thurs from 9:00 am to 12 pm at the South east entrance of the city hall.