Loading...
HomeMy WebLinkAbout276185_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101106991 PROJECT ADDRESS: 1851 E First St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A OCCUPANCY CLASSIFICATION(S): S2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/17/2021 INITIAL REVIEW 6/19/2021 EXPIRATION 12/14/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Randall Patrick 3. TEL: (949)724-1499 FAX: VALUATION: $22,500.00 EMAIL: rand@spaces-oc.com FLOOD ZONE: X-0602320277J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressedPlease indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Indicate the type of construction and fire-sprinklered information on the existing parking garage building.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Provide structural anchorage design and details to support the 8 feet tall enclosure wall. The anchorage shall be able to support the lateral seismic and wind load in accordance with minimum design load and load combination per CBC Chapter 16 and ASCE 7-16. Provide details on the drawing.END OF COMMENTS