HomeMy WebLinkAbout276185_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101106991
PROJECT ADDRESS:
1851 E First St
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
I A
OCCUPANCY CLASSIFICATION(S):
S2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/17/2021
INITIAL REVIEW
6/19/2021
EXPIRATION
12/14/2021
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Randall Patrick
3.
TEL:
(949)724-1499
FAX:
VALUATION: $22,500.00
EMAIL:
rand@spaces-oc.com
FLOOD ZONE: X-0602320277J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressedPlease indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Indicate the type of construction and fire-sprinklered information on the existing parking garage building.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.Provide structural anchorage design and details to support the 8 feet tall enclosure wall. The anchorage shall be able to support the lateral seismic and wind load in accordance with minimum design load and load combination per CBC Chapter 16 and ASCE 7-16. Provide details on the drawing.END OF COMMENTS