HomeMy WebLinkAbout275767_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101106886 PROJECT ADDRESS: 3021 S Shannon St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/7/2021 INITIAL REVIEW 6/13/2021 EXPIRATION 12/4/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bryan Wolfe 3. TEL: (949)798-7300 FAX: VALUATION: $159,120.00 EMAIL: b.wolfe@interiorarchitects.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.Indicate detail and section references as to their appropriate location.Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Heights of partition, suspended ceiling, structure above.CBC Section 11B-404.2.9, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.Provide minimum 36” clearance between the reception desk and the wall.Show sink the breakroom complies with accessibility and show the cabinet door in fully openable. Provide 60” clearance from the wall to the sink on all the bathrooms.Provide knee clearance for the sinks in all bathrooms.Provide minimum 12” clearance to the strike edge of door #112.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit sign with the following words as appropriate: - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”Complete the attached Disabled Accessibility Documentation Form.Note ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)Provide engineering calculation and framing plan for gypsum board ceiling.Provide ICC report and span table for ceiling joists.Provide detail how T-bar ceilings connected to the structure above.Sheet AN8-0 , door note #28 shows card reader, please show location and separate permit required or remove it if it doesn’t apply. To pick up the marked –up plan, please contact the plancheck engineer for pick up appointment.To resubmit your plans, you may drop them off Monday – Thursday from 8am-1pm, inside the City Hall Ross Annex lobby, across from the Information Desk.