PLAN CHECK NO:
101105510-5524
PROJECT ADDRESS:
1142 N Bewley St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
U, R-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/20/2021
INITIAL REVIEW
2/17/2021
EXPIRATION
7/19/2021
RECHECKS:
1.6/1/2021
PROJECT APPLICANT CONTACT PERSON:
2.8/5/2021
Ada Rose
3.
TEL:
(714)426-2953
FAX:
VALUATION: $543,300.00
EMAIL:
ada@yngarchitects.com
FLOOD ZONE: A-0602320143J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans, along with two (2) copies of supporting documents (structural calculations, soil reports, hydrology reports, Elevation Certificate, etc.).
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
-Grading Permit. Application is made through the Building Safety Division (647-5800) and the
plan review is by the Public Works Agency (647-5039).
This project is in a special flood hazard area designated on the flood insurance rate map (FIRM) as zone A.
3rd Review Comment: Response was incomplete. Please provide the following information on the plan:
Please add note on plans: "A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a FINAL CERTIFICATE must be submitted at the time of final inspection."
Provide a complete Elevation Certificate. ELEVATION CERTIFICATE (EC) shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying.
The Elevation Certificate shall be reproduced onto the plan.
Sheet A0.1:
3rd Review Comment: Please add Prefabricated Roof Trusses under the Deferred Submittal Item.
Structural Review Comment:
Reminder: Final structural calculation and plans shall be stamped, signed and dated by the engineer of record.
Sheet S202: Roof framing Plan – Building A
3rd Review Comment: Response was incomplete. Please provide the following:
On the plan, please clearly identify/show location of the bearing walls (interior and exterior)
A drag truss is required at gridline 12. Please show drag truss with drag loads.
Please provide detail at 6x12 supporting high roof over plan 1A Master bathroom.
On the plan, please clearly show California framing where occurred.
Please provide detail to show connection of non-bearing wall to roof trusses.
Detail 6/S311: Please revise detail to show air gap between roof truss bottom chord and top plates with Simpson clip.
Sheet S205: Roof framing Building B
3rd Review Comment: Response was incomplete. Please provide the following:
Provide detail to show connection of non-bearing wall to roof truss.
Please provide detail at 4x12 header at the high roof to show header in relative to main roof trusses.
Provide detail to show connection of 4x12 header to post.
At gridlines 2 and 10.1: Please provide detail to show transfer of lateral loads from roof diaphragm to shear wall (at the interior wall).
Sheet S208: Roof framing Building C
3rd Review Comment: Response was incomplete. Please provide the following:
Provide detail to show connection of non-bearing wall to roof truss. Cross-reference detail on the plan.
At gridlines 2 and 10.1: Please provide detail to show transfer of lateral loads from roof diaphragm to shear wall (at the interior wall).
Sheet S211: Roof Framing Building D
3rd Review Comment: Response was incomplete. Please provide the following:
6x roof beam over the high roof: Please provided detail section to show 6x beam in relative to main roof truss.
On the plan, please clearly show California frames where occurred.
At gridline G: Please specify drag loads for the girder truss that’s part of the chord/strut.