Loading...
HomeMy WebLinkAbout277924_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107522 PROJECT ADDRESS: 6 E Hutton Center Dr Unit# 600 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/13/2021 INITIAL REVIEW 8/29/2021 EXPIRATION 2/9/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Alfredo Vite 3. TEL: (949)788-4120 FAX: VALUATION: $70,000.00 EMAIL: avite@waremalcomb.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) Apply Building Permit for creating new tenant suite (suite 625). A meeting with Planning Division is required for Planning approval. The scope of the new suite can be combined on the same plan with current permit (101107522) for suite 600. However, both plans must be approved and permit issued together. If two building permits are sharing with the same plan, address for each suite shall be shown on the title block on each sheet, and supporting documents (e.g. structural calculation, energy design…). Provide complete existing floor plan at the entire story prior to alteration. Provide complete proposed floor plan at the story being altered and identify the location of each suite and demising walls. (Please do not combine Exit plan and the proposed floor plan. Show separate plans) Provide reflected ceiling plans for alteration of the ceiling construction. Cross-reference applicable details from sheet I3.1 into the ceiling plan. Sheet I0.1. Specify whether the building is fire-sprinklered. Sheet I0.1. Clarify the “affected area 120 sf.” on plan. Show the affected area on plan to verify the square footage. Sheet I0.1. Revise the cover sheet to show exiting square footage of the suite 600 (prior to separation) Sheet I0.1. Revise the cover sheet to show proposed square footage of the suite 600 (after separation) Sheet I0.1. Revise the cover sheet to show proposed square footage of the new tenant suite with assigned address on plan. Sheet I2.1. Floor plan note #1. Provide wall assembly, structural framing and bracing details demonstrating pony-up existing wall to full height wall. Show design to comply with 2019 CBC. Sheet I2.1. Door schedule, provide door specification to provide minimum 80” clear opening height. Sheet I2.1. Show 18” minimum maneuvering clearance on the pull-side of the new door on plan. Sheet 10.5. On the egress plan, provide tactile signage on the egress side of the new egress doors. Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” Sheet 10.5. Refer to note #6b. Provide wall-mounted tactile exit sign details. Sheet I3.1. Provide structural details to design lateral bracing at the top and at the bottom of the new non-bearing walls. Detail 5/I3.1 and 9/I3.1 are not shown.END OF COMMENTS