Loading...
HomeMy WebLinkAbout276703_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107124 PROJECT ADDRESS: 1901 N Fairview St Bldg# F PLAN CHECK ENGINEER: Le, TungTEL:714 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): A-4, B, E, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/1/2021 INITIAL REVIEW 7/13/2021 EXPIRATION 12/28/2021 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Houston Agan 3. TEL: (949)282-9753 FAX: VALUATION: EMAIL: hagan@snyderlangston.com FLOOD ZONE: X-0602320144J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Please provide details to show connection/attachment of the basketball backboard support to roof structural member. Basketball backboard supports shop drawings shall be submitted to the engineer of record for review and approval. The engineer of record should “review” stamp the plan for general conformance with the building design.