Loading...
HomeMy WebLinkAbout278877_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107800 PROJECT ADDRESS: 3400 W Warner Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/27/2021 INITIAL REVIEW 9/8/2021 EXPIRATION 2/23/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Chad Reynoso 3. TEL: (714)385-1835205 FAX: VALUATION: $60,000.00 EMAIL: creynoso@peica.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Sheet G001. In sheet index, add note “for reference only” on all electrical sheets.Add note to the new gate: Handles, pulls, latches, locks, and other operable parts on gates shall comply with 11B-309.4 Operation. Operable parts of such hardware shall be 34 inches minimum and 44 inches maximum above the finish floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides. §11B-404.2.7Add note to the new gate:Swinging gate surfaces within 10 inches of the finish floor or ground measured vertically shall have a smooth surface on the push side extending the full width of the door or gate. Parts creating horizontal or vertical joints in these surfaces shall be within 1/16 inch of the same plane as the other and be free of sharp or abrasive edges. Cavities created by added kick plates shall be capped. §11B-404.2.10.Sheet S100. Provide specification of the steel posts in detail 1/S100 and 3/S100.Provide foundation plan by licensed engineer in structural design.Cross-reference foundation details in sheet S100 into the applicable location on the foundation plan. The foundation plan is not shown on sheet S100 as indicated in the sheet index. *No corrections marked on the drawings and structural calculations.END OF COMMENTS