HomeMy WebLinkAbout274058_4_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101106376
PROJECT ADDRESS:
3122 S Halladay St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V-B
OCCUPANCY CLASSIFICATION(S):
M, B, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/15/2021
INITIAL REVIEW
6/10/2021
EXPIRATION
10/12/2021
RECHECKS:
1.8/3/2021
PROJECT APPLICANT CONTACT PERSON:
2.9/2/2021
Howard Denghausen
3.
TEL:
(949)735-2580
FAX:
VALUATION: $11,600.00
EMAIL:
denghausen@dslextreme.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Sheet 2: Restrooms: Please provide restroom plans with dimensions and details to show compliance with the current code, Chapter 11B, Division 6. 3rd Review Comment:Response was incomplete. Please provide the following: The restroom at the retail sale space shall be made accessible. Please provide restroom plan to show restroom incompliance with Chapter 11B, Division 6: Show 60” turning circle. Door shall not encroach more than 12” into the turning circle. Show minimum 60” clear space for the water closet, measured from the side wall to the edge the sink, and 48” clear in front of the water closet. Water closet shall locate at a distance of 17”-18” from the wall, measured to the centerline of the water closet. The restrooms at Hallway did not comply with the accessibility requirement. Please provide signage at noncompliance restrooms to show / direct people to the accessible restroom.