HomeMy WebLinkAbout279264_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107931 PROJECT ADDRESS: 605 S Susan St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/10/2021 INITIAL REVIEW 9/27/2021 EXPIRATION 3/9/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kevin Nguyen 3. TEL: (714)951-8540 FAX: VALUATION: $370,000.00 EMAIL: kevinnguyentda@yahoo.com FLOOD ZONE: X-0602320256J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. -Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Final plan shall be signed and dated by the person who is responsible for designing the construction documents/plans. Sheet A1: Cover page Under the Legal Description: Please specify Fire Sprinkler is required. On the plan, please list all the deferred submittals. Please specify Photovoltaic systems and Battery Systems are required and to be permitted prior to building frame inspection schedule. Specify minimum size (KW) for PV and Battery system on the plan (See Title 24 Calculations for required capacities). Site plan: Please show distance between patio cover #2 and the “assume” property line between the two units. On the plan, please show surface drainage system to divert rain water away from building foundation walls. Show minimum slope and patterns. The grade shall fall not fewer than 6 inches within the first 10 feet from the foundation wall. Where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, drains, or swales shall be constructed to ensure drainage away from the structure. Impervious surfaces within 10 feet of the building foundation shall be sloped not less than 2 percent away from the building. (R401.3 CRC) Note on plan: Mechanical, Electrical, and Plumbing are not part of this plan review and approval. MEP will be subject to field inspection. Sheet A2: First Floor Plan (House #1) All Plans: Wall legend – Please clearly indicate either 4” or 6” wall; it cannot be both. Please coordinate and provide tempered glass for glazing in doors; glazing located within 24” of door; glazing located adjacent to shower or/and tub. Specify tempered glass on plan. Wall between garage and residence: Wall between garage/carport and dwelling – Provide minimum 1/2-inch gypsum board on the garage side; extended from foundation to the roof sheathing. (R302.6) Garage ceiling where habitable is above: Minimum 5/8-inch Type X gypsum board is required at the underside of floor/ceiling where habitable space is above. Structure(s) supporting floor/ceiling assemblies used for separation shall be protected with 1/2-inch gypsum board. (R302.6) Dining Area: Please provide natural light and ventilation for the dining room. Provide glazing = 0.08 x floor area (minimum of 10-sq. ft.), with openable portion = 0.04 x floor area (minimum of 5-sq. ft.). (R303) Stairway: Please show/provide dimensions for the stairway so that it can be easily located. Door K between garage and residence: Please include the statement door must be self-closing and self-latching. Please provide building sections. Sheet A2.1: Second Floor (House #1) Please specify 42” height guardrail. Specify tempered glass for window located adjacent to shower/tub and windows 6 adjacent to stairway. Please show dimension for stairway so that wall can be easily located. Sheet A3: First Floor (House #2) All Plans: Wall legend – Please clearly indicate either 4” or 6” wall; it cannot be both. Please coordinate and provide tempered glass for glazing in doors; glazing located within 24” of door; glazing located adjacent to shower or/and tub. Specify tempered glass on plan. Wall between garage and residence: Wall between garage/carport and dwelling – Provide minimum 1/2-inch gypsum board on the garage side; extended from foundation to the roof sheathing. (R302.6) Garage ceiling where habitable is above: Minimum 5/8-inch Type X gypsum board is required at the underside of floor/ceiling where habitable space is above. Structure(s) supporting floor/ceiling assemblies used for separation shall be protected with 1/2-inch gypsum board. (R302.6) Door K between garage and residence: Please include the statement door must be self-closing and self-latching. Please provide building sections. Sheet A3.1: Second Floor (House #2) Please specify tempered glass for window located adjacent to shower/tub. Sheet A4: Roofing material: On the plan, please specify ICC report number and maximum weight of the title roof. Please show window header height. Utility Plans: On the plan, please show/provide whole-house vents. Please provide/show method of whole house ventilation in compliance with ASHRAE Standard 62.2. Legend notes: Please omit notes indicated “ADU”. For each dwelling unit, install a listed raceway to accommodate a dedicated 208/240-volt branch circuit (40 amp). On the plan, please show compliance with Section 4.106.4.1, California Green Building Code. Please show/provide a receptacle outlet located within 3-ft of the water heater. Structural Plan Review Comments: Structural plans were incomplete. Plan review will continue at time of resubmittal and additional comments may be required. Plan shall be stamped, signed, and dated by a California registered civil engineer or a California licensed architect. Sheet S3: Plan shall be legible. Please increase font size. Sheet S3, Design criteria: Please revise roof live load = 17 psf to match structural calculation. Sheet S3, Design Criteria: Please update design parameters to match with structural calculation. Sheet S-5: Please clearly reference section onto the plan so that it can be located where the building is cut through. Additional sections may be required. Sheet S-5: Please clearly identify/label each space within the building. Sheet S1.2: Roof framing Plan (House #1) Please revise wall legend to specify either 4” wall or 6” wall. For clarify, it cannot be both. On the plan, please clearly show/provide roof truss layout. Show trusses span direction, bearing locations, spacing, girder trusses, drag trusses with drag loads, and etc. Reference detail 6/S4.1: Please revise detail to provide positive connection between roof trusses and wall top plates. Simpson hurricane tie may be used. Reference detail 22/S4.1: Please revise detail to show support and connection of lower roof truss to wall. Detail 22/S4.1: Please clearly show/specify plywood sheathing at both roof and wall. Show shear transfer. Sheet S1.2: Second Floor Fram’g Plan (House #1) For clarity, please revise Title Block to specify “Roof Headers/Beams Plan” instead of second floor framing plan. Beams RB-1 & RB-2: Please provide/show horizontal drag strap at each end of the beam for developing a chord/strut at wall line C. Provide detail to show horizontal strap between beam and wall top plates; detail 11/S4 was not applicable. Detail 5/S4.1: Please revise detail to provide positive connection between roof trusses and beam. A Simpson hurricane tie may be used. Sheet S1.1: Floor Framing Plan (House #1) Please revise wall legend to specify either 4” wall or 6” wall. For clarify, it cannot be both. Shear walls are required at the following locations: At line C, Line B, Line 1.8, Line 1.2, A, line B.8, etc. Line B & Line 1: Please provide/show horizontal drag straps between floor beams and walls. Provide details and clearly cross-reference detail onto the plan. Detail 15 & 16/S4: Please revise detail to show attachment of lower trusses to 2nd floor wall. Detail 15 & 15/S4: Please provide detail to show transfer of floor diaphragm loads to shear wall. Plywood wood sheathing is required at the bottom cord of the trusses for a continuous floor diaphragm. Detail 17/S4.1: Beam supported at the exterior wall – Please revise detail to show end support with end cut to meet roof slope. Detail 16/S4.1 called out at the patio cover for end post was not applicable. Please provide detail to show end post connection. Detail 15/S4: called out at beam FB-1 – Please provide detail to show floor joist supported by the beam (floor joists perpendicular to beam). Referenced detail 22/S4.1 called out at line B: Please revise detail to show attachment of low roof truss to second floor wall. Detail 12/S4 called out at line C – Please show lower roof and shear transfer from 2nd story wall to floor diaphragm to lower roof to adjacent shear walls. Referenced detail 20/S4: Please revise detail to show/provide 11” treads, or provide nosing of ¾” minimum and 1 ¼” maximum at 10” treads. Simpson Strong Walls: 7-ft height strong wall appeared inaccurate – Please coordinate header wall height and provide sufficient Strong Wall type. Structural calculation: House #1 Floor beam supporting shear wall above – Please design beam with seismic forces and omega factor (overstrength factor). For example, beam FB-7, FB-8, FB-14, FB-1, FB-2, FB-11, FB-12, etc. Floor beam, FB-7: Please revise beam calculation to include exterior wall loads and lower roof loads. Floor beam FB-12: Please include exterior wall loads, lower roof, and reaction loads from beam FB-7. Floor beam FB-8: Please show loadings on beam. Please include exterior wall loads, lower roof, reaction loads from beam FB-14. Floor diaphragm and low roof diaphragm (vertical discontinuity): Please provide calculation and details for shear transfer from the floor and diaphragm to adjacent shear wall panels in accordance with Section 12.3.3.4, ASCE7-16 for vertical structural irregularities. Sheet S1: Foundation Plan (House #1) Please show/provide post at the end of floor beam FB-8, and FB-11 to support beam above. Footing details: Please revise footing details to show/provide minimum 2-#5 rebar at top and bottom. (Per soil report) Slab information: Please revise foundation plan and details to specify 5” thick concrete slab with spacing of rebar at 16” on center, and use 10 mil vapor barrier. (Per soil report) Please specify/show footing dimensions for the footing supporting the Simpson Strong walls. Provide detail for interior pad footing. Detail shall be clearly cross-referenced onto the plan. Please coordinate foundation design with revised loads as commented above. Please submit final foundation plan and details to the geotechnical engineer for review and approval. The geotechnical engineer should “review” stamp the plan for general conformance with the soil report recommendation. Sheet S2.2: Roof Framing Plan (House #2) Please revise wall legend to specify either 4” wall or 6” wall; it cannot be both. On the plan, please clearly show/provide roof truss layout. Show trusses span direction, bearing locations, spacing, girder trusses, drag trusses with drag loads, and etc. Reference detail 6/S4.1: Please revise detail to provide positive connection between roof trusses and wall top plates. Simpson hurricane tie may be used. Reference detail 22/S4.1: Please revise detail to show support and connection of lower roof truss to wall. Detail 22/S4.1: Please clearly show/specify plywood sheathing at both roof and wall. Show shear transfer. Detail 21/S4.1 and 15/S4.1 called out on the roof level was not applicable. Sheet S2.2: Second Floor Fram’g Plan (House #2) For clarity, please revise Title Block to specify “Roof Headers/Beams Plan” instead of second floor framing plan. At gridline B: Beams RB-1 & RB-2 – Please provide/show horizontal drag strap at each end of the beam for developing a chord/strut at wall line C. Provide detail to show horizontal strap between beam and wall top plates; detail 11/S4 was not applicable. At gridline C: Beam FB-3 – Please provide/show horizontal drag strap between beam and wall. At gridline 2 and 4: Please provide drag trusses with drag straps align with the shear walls. Detail 5/S4.1: Please revise detail to provide positive connection between roof trusses and beam. A Simpson hurricane tie may be used. Sheet S2.1: Second Floor Framing Plan (House 2) Please revise wall legend to specify either 4” wall or 6” wall. For clarify, it cannot be both. Line C: Please show horizontal strap between FB-10 and wall top plates. Detail 13/S4 called out at floor beam FB-2 was Please show/provide post at each end of floor beam above the entry lobby. Please provide beam ID number for FB-5, FH-3, etc. on the plan. Please provide shear walls at line A.2; line A.5 and line 2.8. Simpson Strong Walls: 7-ft height strong wall appeared inaccurate – Please coordinate header wall height and provide sufficient Strong Wall type. Structural calculation: House #2 Floor beam supporting shear wall above – Please design beam with seismic forces and omega factor (overstrength factor). For example, beam FB-1, FB-7, FB-9, FB-6, FB-2, FB-3, FH-2, etc. Floor beam, FB-7 & FB-9: Please revise beam calculation to include exterior wall loads and lower roof loads. Floor beam FB-1: Please include exterior wall loads, lower roof, and reaction loads from beam FB-7. Floor beam FB-5: Please revise plan to provide 3.5 x 11.25 PSL beam, per structural calculation. Floor diaphragm and low roof diaphragm (vertical discontinuity): Please provide calculation and details for shear transfer from the floor and diaphragm to adjacent shear wall panels in accordance with Section 12.3.3.4, ASCE7-16 for vertical structural irregularities. Sheet S2: Foundation Plan (House #2) Please provide continue footing at shear wall located entry lobby and living room. Footing details: Please revise footing details to show/provide minimum 2-#5 rebar at top and bottom. (Per soil report) Slab information: Please revise foundation plan and details to specify 5” thick concrete slab with spacing of rebar at 16” on center, and use 10 mil vapor barrier. (Per soil report) Please specify/show footing dimensions for the footing supporting the Simpson Strong walls. Please coordinate foundation design with revised loads as commented above. Please submit final foundation plan and details to the geotechnical engineer for review and approval. The geotechnical engineer should “review” stamp the plan for general conformance with the soil report recommendation.