Loading...
HomeMy WebLinkAbout279277_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107936 PROJECT ADDRESS: 3710 Westminster Ave Unit# B PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/10/2021 INITIAL REVIEW 9/25/2021 EXPIRATION 3/9/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Daisy Ma 3. TEL: (626)766-0086 FAX: VALUATION: $40,000.00 EMAIL: topwayarchi@gmail.com FLOOD ZONE: A APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)PLAN CHECK COMMENTSRefer to plan check comments on plan. Revise plan.Sheet D-3. Revise partition typical section view detail of all new partitions and ceilings showing: - Partitions are either span vertically full height to directly supported by the roof framing or bracing diagonally at maximum 45 degree at the top of the non-full height partition walls.- Size, spacing, and material of framing members including diagonal bracing. - It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing field problem of 3½” wide studs not being able to accommodate plumbing pipes. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - A35 does not apply to concrete connection. Revise and specify attachments for sill plate to concrete floor connection. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above.Sheet A-3. Provide framing plans to show framing design and connection details in the restroom new drywall ceiling. Specify framing size, spacing, direction of framing and connection details. Provide foundation plan to support the ceiling. Plans designed, stamped, signed and prepared by a licensed engineer may be required.EGRESSSheet A-3. Note the following on the plans: “The means of egress, including the exit discharge, will be illuminated to a level of not less than one foot-candle at the walking surface at all times the building space served by the means of egress is occupied”. [CBC 1006.1; 1006.2]Sheet A-3. Illumination for egress in the new hallway is required. Provide lighting design on plan.Sheet A-3. Note on the plans: “Exit signs shall be internally or externally illuminated at all times. Externally illuminated exit signs shall be connected to an emergency power system (batteries, unit equipment or an on-site generator) that will automatically illuminate the exit signs for a duration of not less than 90 minutes in case of primary power loss.” [CBC 1013]Sheet A-2. Provide tactile exit signs at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”Sheet A-2. Provide signage detail on plan. For the purpose of Section 1013.4, the term “tactile exit signs” shall mean those required signs that comply with Chapter 11A, section 1143A or Chapter 11B, section 11B-703.1, 11B-703.2, 11B-703.3 or 11B-703.5.Sheet A-2. Door #1 and door #4 equipped with a key operated locking device shall have a readily visible, durable sign posted on the egress side adjacent to the door stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. The sign shall have one-inch high letters on a contrasting background.ACCESSIBILITYSheet A-1. Under walks and sidewalks notes, update the outdated code sections and relevant requirements to the applicable code sections complying with 2019 California Building Code.Sheet A-1.1. Revise the “No parking” marking to be located at the bottom of the access aisle. (See CBC Figure 11B-502.2 (a).Sheet A-1.1. Show dimensions of the surface ISA marking. Minimum 36”x36” ISA sign is required.Sheet D-1. Door schedule. Revise door #3 through #13. Door openings shall provide a clear width of 32 inches minimum. Clear openings of doorways with swinging doors shall be measured between the face of the door and the stop, with the door open 90 degrees. Openings more than 24 inches deep shall provide a clear opening of 36 inches minimum. There shall be no projections into the required clear opening width lower than 34 inches above the finish floor or ground. Projections into the clear opening width between 34 inches and 80 inches above the finish floor or ground shall not exceed 4 inches. §11B-404.2.3 (2’-8” door does not have 32” clear open width)Sheet D-1. Thresholds, if provided at doorways, shall be ½ inch high maximum. Raised thresholds and changes in level at doorways shall comply with 11B-302 Floor or Ground Surfaces and 11B-303 Changes in Level. §11B-404.2.5.Sheet D-1. Handles, pulls, latches, locks, and other operable parts on doors and gates shall comply with 11B-309.4 Operation. Operable parts of such hardware shall be 34 inches minimum and 44 inches maximum above the finish floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides. §11B-404.2.7 Sheet D-1. Detail C. Revise mounting height for wall-mounted signage. Tactile characters on signs shall be located 48 inches minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches maximum above the finish floor or ground surface, measured from the baseline of the highest line of raised characters. Refer to Figure 11B-703.4.1. (11B-703.4.1). Sheet D-1. Detail A. Remove pictogram and letter from the door mounting unisex restroom sign. Sheet D-1. Detail A. Add note to detail A:”Unisex toilet and bathing facilities shall be identified by a circle, ¼ inch thick and 12 inches in diameter with a ¼ inch thick triangle with a vertex pointing upward superimposed on the circle and within the 12-inch diameter. The triangle symbol shall contrast with the circle symbol, either light on a dark background or dark on a light background. The circle symbol shall contrast with the door, either light on a dark background or dark on a light background. §11B-703.7.2.6.3” Sheet A-2. Revise hallway by the storage room and revise bed within the massage room: The front approach level area shall have a length in the direction of door swing of at least 60” and the length opposite the direction of door swing of 48” as measured at right angles to the plane of the door in the closed position. (CBC 11B-404.2.4.1 & Table 11B-404.2.4.1) Sheet A-2. Recessed doors maneuvering clearances for forward approach shall be provided when any obstruction within 18” of the latch side at an interior doorway, or within 24” of the latch side of an exterior doorway, projects more than 8” beyond the face of the door, measured perpendicular to the face of the door or gate. (CBC 11B-404.2.4.3 & Figure 11B-404.2.4.3 (a)) ACCESSIBLE RESTROOM Sheet A-2. Show clearance on plan. Clearance around a water closet shall be 60 inches minimum measured perpendicular from the sidewall and 56 inches minimum measured perpendicular from the rear wall. A minimum 60 inches wide and 48 inches deep maneuvering space shall be provided in front of the water closet. §11B-604.3.1 Sheet D-2. Detail 3. The rear grab bar shall be 36 inches long minimum and extend from the centerline of the water closet 12 inches minimum on one side and 24 inches minimum on the other side. §11B-604.5.2 (See exception) ENERGY Sheet LTG. Page 7 of the NRCC-LTI-E form. The documentation author’s declaration stamen shall be signed by both documentation author and responsible designer. END OF COMMENTS