Loading...
HomeMy WebLinkAbout276051_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101106964 PROJECT ADDRESS: 2428 N Grand Ave Unit# F PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/15/2021 INITIAL REVIEW 7/13/2021 EXPIRATION 12/12/2021 RECHECKS: 1.08/29/2021 PROJECT APPLICANT CONTACT PERSON: 2. Amir Seilabi 3. TEL: (323)816-9793 FAX: VALUATION: $10,000.00 EMAIL: seilabi@gmail.com FLOOD ZONE: X-0602320163J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)Remaining comments:Sheet A2-2. Update signage cross-reference from 8/AD1-1 to 8/AD1-0 and from 1/AD1-2 to 1/AD1-1.STRUCTURALDetail 1/A2.3. Provide method of attaching partition walls to the roof framing above. Detail A does not provide sufficient support and information is not clear. Provide full height wall to the roof or diagonal bracing at the top of the partial height partition. Specify spacing, grade, size, direction and angle or bracing. Specify number, type, size, spacingof fastenersconnecting partitions, bracing and building roof framing. The interior partition including their finish materials shall have adequate strength and stiffness to resist the loads to which they are subjected but not less than a horizontal load of 5 psf. (CBC 1607.15).END OF COMMENTS