Loading...
HomeMy WebLinkAbout270825_4_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102105442 PROJECT ADDRESS: 611 E Santa Clara Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/10/2020 INITIAL REVIEW 2/3/2021 EXPIRATION 6/8/2021 RECHECKS: 1.7/20/2021 PROJECT APPLICANT CONTACT PERSON: 2.8/27/2021 Noah Elias 3. TEL: (949)378-5275 FAX: VALUATION: $15,000.00 EMAIL: noah@noahstudios.net FLOOD ZONE: X-0602320163J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. [2/3/21] Plans were incomplete. In order to provide a comprehensive plan review, a complete set of plans and calculations are required. Please provide the following information on the next submittal for plan review: [7/20/21] Second Review – Please provide the following informationPlease revise Project Address on the right side Tittle Block to show City of Santa Ana (not Newport Beach). 3rd Review Comment: Plan submittal was incomplete. There were missing architectural plans. Please submit three completed corrected sets of plans. Sheet A-1: Please provide job description to specify legalizing the existing patio cover with fire-place and existing storage structure.3rd Review Comment: Architectural plans were not provided on the resubmittal. Sheet A-3: Please provide structural plans, details and calculation for the storage structure. 3rd Review Comment: Architectural plans were not provided on the resubmittal.Sheet S-1: New ceiling ties – Please specify spacing of ceiling ties at 24” on center (match structural calculation). 3rd Review Comment: Plan and calculation showed rafters spacing at 36” on center – please provide the following: The roof sheathing span rating is 32/16 – Please limit spacing of roof rafters with the roof sheathing span rating. Please coordinate and revise plan accordingly. Detail 4/S1: Please revise detail to show/provide minimum 7-16d nails per revised structural calculation. Sheet S-1: spacing of roof rafter and ceiling joist (tie) – Please coordinate framing plan with patio floor plan and Section A on sheet A-2. Verify spacing of roof rafters existing vs. new and review plans accordingly. Revise structural calculation as necessary. 3rd Review Comment: Architectural plans were not provided on the resubmittal.Please provide calculation for the freestanding masonry fireplace and chimney.3rd Review Comment: Calculation was incomplete. Please provide chimney design – show wall design with opening. 3rd Review Comment: Sheet S2 was provided for the storage structure – Provide calculation for ceiling tie lap connection at 48” on center. Exterior wall of storage structure shall be supported by a continuous footing for building in seismic design category D. (R403.1.2)**Additional plan check fee may be required due to changing of design and incomplete submittal.