PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101108004
PROJECT ADDRESS:
2800 N Main St Unit# 584
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
II B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/20/2021
INITIAL REVIEW
9/26/2021
EXPIRATION
3/19/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
TJ Kim
3.
TEL:
(213)268-9661
FAX:
VALUATION: $40,000.00
EMAIL:
tjkim@designinex.com
FLOOD ZONE: X-0602320163J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceReference each fire-resistive assembly to a CBC Chapter 7, Table and Item number:
- ShaftsCBC 11B-405.5 The clear width of a ramp and the clear width between handrails, if provided, shall be 36” minimum.Size of top and bottom landings. Top landings shall be not less than 60” wide and shall have a length of not less than 60” in the direction of ramp run. Landings at the bottom of ramps shall have a dimension in the direction of ramp run of not less than 72”.Encroachment of doors. Doors in any position shall not reduce the minimum dimension of the landing to less than 42” and shall not reduce the required width by more than 3” when fully open. CBC Section 1133B.5.5.1, Handrails for ramps:
- Are required on ramps that provide access if the slope exceeds 1’ rise in 20’ of horizontal run
(5-percent gradient), except that at exterior door landings
- Are not required on ramps less than 6” rise or 72” in length
- Shall be placed on each side of each ramp, shall be continuous the full length of the ramp
- Shall be 34 to 38” above the ramp surface to the top of the handrails
- Shall extend a minimum of 1’ beyond the top and bottom of the ramp and shall be parallel with the
floor or ground surfaceShow how hoods are supported laterally.Plans shall indicate how required fire resistive integrity will be maintained where the attachment be supported from the fire rating deck.