Loading...
HomeMy WebLinkAbout279611_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101108034 PROJECT ADDRESS: 1901 N Fairview St Bldg# F PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/22/2021 INITIAL REVIEW 10/14/2021 EXPIRATION 3/21/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Tony Armer 3. TEL: (424)405-4422 FAX: VALUATION: $25,000.00 EMAIL: tonya@berliner-architects.com FLOOD ZONE: X-0602320144J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2018 IBC, 2019 California Building Standards Code and ASCE 7-16CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Please remove and cross out all the unrelated details on the drawings.On page 14 of calculation provided height is 6.75 ft, versus 8.5 ft , please revise calculation accordingly.Lateral bearing pressure for clay, sandy clay soil per table 1806.2 is 100 psf/ft, calculation shows 200 psf /ft , provide soils report to justify or revise calculation per 100 psf/ft.Detail 2 on sheet XS0.00, show 9’ tall sign versus 8’-6” , please clarify.