Loading...
HomeMy WebLinkAbout279048_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107856 PROJECT ADDRESS: 3360 S Bristol St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/7/2021 INITIAL REVIEW 9/11/2021 EXPIRATION 3/6/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Nathaniel Mlinar 3. TEL: (952)345-6041 FAX: VALUATION: $187,000.00 EMAIL: nathaniel@elderjones.com FLOOD ZONE: X-0602320259J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) Note the following on the plans: “The means of egress, including the exit discharge, will be illuminated to a level of not less than one foot-candle at the walking surface at all times the building space served by the means of egress is occupied”. Note on the exit plans: “Exit signs shall be internally or externally illuminated at all times. Externally illuminated exit signs shall be connected to an emergency power system (batteries, unit equipment or an on-site generator) that will automatically illuminate the exit signs for a duration of not less than 90 minutes in case of primary power loss.” Note on the exit plan. Exit doors equipped with a key operated locking device shall have a readily visible, durable sign posted on the egress side adjacent to the door stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. The sign shall have one-inch high letters on a contrasting background. Fill out the disabled access compliance documentation form by the architect in record. Use separate form for each suite. Clarify in the form and on plan if the existing accessible path of travel fully or partially complies with 2019 CBC and show if any proposed design, detail and location of improvement in compliance with accessibility requirements along the accessible path of travel in accordance with CBC Section 11B-202. Note: Return the filled form at the next plan check submittal. On the site plan, identify the accessible path of travel from (1) public streets and from (2) an accessible parking space to the accessible entrance of the alteration area. Provide accessible drinking fountain details in sheet A0.3. No fewer than two drinking fountains shall be provided. When provided, one drinking fountain shall comply with 11B-602.1 through 11B-602.6, 11B-602.8 and 11B-602.9 and one drinking fountain shall comply with 11B-602.7 and 11B-602.9. §11B-211.2 (See exception)END OF COMMENTS