Loading...
HomeMy WebLinkAbout279787_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101108090 PROJECT ADDRESS: 3861 S Bristol St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/28/2021 INITIAL REVIEW 10/9/2021 EXPIRATION 3/27/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Ron Bartlo 3. TEL: (949)459-9494 FAX: VALUATION: $16,000.00 EMAIL: rbarchitect@cox.net FLOOD ZONE: X-0602320259J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Plan check corrections:The Engineer of Record in responsible charge of the structural design of the building shall provide a statement on the truss calculation stating that he or she has reviewed and approved for loads, location, and suitability for intended use. Provide approval stamp with signature from the engineer or architect of record on the truss calculation.Truss repaired details shown in the truss repair calculation shall be incorporated into a full size of drawing, including the following:Framing plans with connection details referenced.Truss repair details.Stamp, date and signature of the truss design engineer.Approval statement, date and signature by the building structural engineer of record.END OF COMMENTS