Loading...
HomeMy WebLinkAbout280003_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101108152 PROJECT ADDRESS: 401 W First St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): A-3, B, R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/4/2021 INITIAL REVIEW 10/11/2021 EXPIRATION 4/2/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Manuel Gama 3. TEL: (323)536-3102 FAX: VALUATION: EMAIL: manuel@relativityarchitects.com FLOOD ZONE: X-0602320276J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). - Police Department approval on the corrected/final set of drawings (647-5840). - Public Works Agency approval (647-5039).Sheet A000. Missing architect’s signature and date when plans are signed on plan at (2) locations. Provide signature and date on the (1) verification of the existing accessible path of travel statement and (2) drawings by the architectural stamp.Sheet A310.1. Clarify the east elevation. The new window (CW2) and door (CD1) are located on the new south wall. Revise proposed east elevation and provide proposed south elevation.S210. Clarify framing plan to update framing design and connection details in accordance with structural calculation. Refer to key plan on page 6 of the structural calculation. Call out new beams, drag member, new steel columns and connection details. Revise plans.S200. Clarify foundation plan to update structural design and details in accordance with structural calculation and key plan. Refer to page 52 of the structural calculation. Revise plans.END OF COMMENTS