PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101108152
PROJECT ADDRESS:
401 W First St
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
A-3, B, R-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/4/2021
INITIAL REVIEW
10/11/2021
EXPIRATION
4/2/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Manuel Gama
3.
TEL:
(323)536-3102
FAX:
VALUATION:
EMAIL:
manuel@relativityarchitects.com
FLOOD ZONE: X-0602320276J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSThe applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
- Police Department approval on the corrected/final set of drawings (647-5840).
- Public Works Agency approval (647-5039).Sheet A000. Missing architect’s signature and date when plans are signed on plan at (2) locations. Provide signature and date on the (1) verification of the existing accessible path of travel statement and (2) drawings by the architectural stamp.Sheet A310.1. Clarify the east elevation. The new window (CW2) and door (CD1) are located on the new south wall. Revise proposed east elevation and provide proposed south elevation.S210. Clarify framing plan to update framing design and connection details in accordance with structural calculation. Refer to key plan on page 6 of the structural calculation. Call out new beams, drag member, new steel columns and connection details. Revise plans.S200. Clarify foundation plan to update structural design and details in accordance with structural calculation and key plan. Refer to page 52 of the structural calculation. Revise plans.END OF COMMENTS