Loading...
HomeMy WebLinkAbout278737_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107761 PROJECT ADDRESS: 1148 W Civic Center Dr PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-2, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/24/2021 INITIAL REVIEW 10/6/2021 EXPIRATION 2/20/2022 RECHECKS: 1.11/1/2021 PROJECT APPLICANT CONTACT PERSON: 2. Ali Sahabi 3. TEL: (323)605-0000 FAX: VALUATION: $50,000.00 EMAIL: engineering@optimumseismic.com FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.Approval and Instruction All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). Sheet A-0: City of Santa Ana does not adopt or using LABC Chapter 93 for seismic upgrade – Please omit/delete all notes that made reference to the LABC Chapter 93. Apply to all sheets. Sheet SD-1: Detail 16: Please revise detail to show transfer of lateral loads from 2nd floor wall to floor diaphragm. Detail 9: Please provide calculation and details to show shear transfer of diaphragm loads to steel column. The shear force will be concentrated at the steel column and will make a transfer from the 4x block and metal trap to the steel column. Please justify the connection is capable of transferring lateral loads to the column. Detail 9, 10, 12: Details have not been revised. The A35 connected to plywood appeared insufficient. Please coordinate and revise details accordingly. Foundation: Footing under column – Please provide footing on all sides of the column to avoid eccentric loading to the foundation/footing. Detail A & 1 on sheet SD-1: A larger column base plate and footing are recommended (space out anchor bolts). On the plan, please specify plate size and enlarged footing at column. Detail 2/SD-1: Please provide continuous longitudinal dowels (rebar) from the grade beam to the footing below the plate.