HomeMy WebLinkAbout280735_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101108364 PROJECT ADDRESS: 1551 N Tustin Ave Unit# 900 PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/25/2021 INITIAL REVIEW 10/31/2021 EXPIRATION 4/23/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Sheila Andelin 3. TEL: (949)757-6996 FAX: (949)757-6999 VALUATION: $50,000.00 EMAIL: O3designinc@icloud.com FLOOD ZONE: X-0602320164J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above.CBC Section 11B-404.2.7, Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.CBC Section 11B-404.2.9Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds. Provide 12 “ clearance at door # 5.Exit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Tactile exit signs shall be required at the following locations:( For Stairways) - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit sign with the following words as appropriate:“EXIT STAIR DOWN”“EXIT RAMP DOWN”“EXIT STAIR UP” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsEach lot or parking structure where parking is provided for the public as clients, guest or employees, shall provide accessible parking as required by CBC Section 11B-502.( Provide detail) Provide width of Access Aisle for parking 1 and 2.Remove truncated domes from access aisles. Also remove from access aisle between parking 6 and 7. Provide truncated dome at the single door but cannot be on access aisle.Sanitary facilities serving the area of new work shall be disabled accessible. Revise the drawings to show compliance with CBC Section11B-603 and 11B-604. Provide bathroom for 9th floor that serves unit 900, provide path of travel to the bathroom. Show microwave complies with accessibility.Complete the attached Disabled Accessibility Documentation Form.