Loading...
HomeMy WebLinkAbout279066_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101107863 PROJECT ADDRESS: 5015 W Edinger Ave Unit# V PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): A-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/2/2021 INITIAL REVIEW 10/7/2021 EXPIRATION 3/1/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Corrine Dolman 3. TEL: (805)215-8373 FAX: VALUATION: $10,000.00 EMAIL: cdolman@dolmanarchitecture.com FLOOD ZONE: X-0602320256J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans - County of Orange Health Department approval on the corrected/final set of drawings (667- 3600) - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)Sheet A0.0. Delete the following note on plan under building summary: “City inspector shall verify at field for compliance prior to final inspection”.Sheet A0.0. Indicate removing folding partitions into the description of the scope on plan.Sheet A1.0. Show correct accessible parking space location. Revise site plan.Provide architectural stamp and signature on sheet A2.2 and A2.3.Provide dateon plan when the architect signs the drawings on all sheets.Sheet A2.2. Incorporate removing stage (key note #7) into the drawings No hand-writing changes.Sheet A2.2. Verify and identify on plan whether the walls to be removed are load-bearing. Please add note on the partition wall legend and keynote #2 to clarify. Note that structural engineering design, plans and details will be required for removing any structural walls (shear wallsor load-bearing walls)END OF COMMENTS