HomeMy WebLinkAbout281365_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101108542
PROJECT ADDRESS:
2035 N Tustin Ave
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
N/A
OCCUPANCY CLASSIFICATION(S):
N/A
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/10/2021
INITIAL REVIEW
1/6/2022
EXPIRATION
5/9/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Heaven Morrison
3.
TEL:
(951)315-9775
FAX:
VALUATION: $50,000.00
EMAIL:
hmorrison@optimumsolarpower.com
FLOOD ZONE: X-0602320164J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2019 California Building Standards Code with local amendments.Clearly indicate the scope of work under this building permit application:
- Revise project job description on the building permit application worksheet to reflect the work to be done
under the subject building permit application.
- Construction drawings must clearly show all work to be done under the subject building permit application.
- Delete all notes and details from drawings that are not a part of the work to be done under the subject building
permit application. This includes mechanical, plumbing and electrical work that is not specifically required by
the Building Code.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide fire clearance distance to all the skylights.Please identify the area at the front of the building, is it carport? On sheet A-103, please identify which detail is used and identify is it tilted panels or it is parallel. Provide anchor bolt spacing.Key note on sheet A-103, shows rafter 2x6 @ 96”oc, please provide roof framing plan and show rafter size, spacing and span of the rafter comply with CBC 2019. If it is tilted panels provide complete structural calculation to show existing roof rafters can carry the uplift from panels.