Loading...
HomeMy WebLinkAbout281728_2_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101108682 PROJECT ADDRESS: 3101 W Harvard St Bldg# E PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/23/2021 INITIAL REVIEW 12/7/2021 EXPIRATION 5/22/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Ken King 3. TEL: (714)434-4887 FAX: VALUATION: EMAIL: kking@slaterbuilders.com FLOOD ZONE:X-0602320256J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThe Engineer of Record in responsible charge of the structural design of the building shall provide a statement on the truss calculation stating that he or she has reviewed and approved for loads, location, and suitability for intended use. Provide approval stamp with signature from the engineer or architect of record on the truss calculation.END OF COMMENTS