HomeMy WebLinkAbout281728_2_Corrections.docxSPC
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101108682
PROJECT ADDRESS:
3101 W Harvard St Bldg# E
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, F-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/23/2021
INITIAL REVIEW
12/7/2021
EXPIRATION
5/22/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Ken King
3.
TEL:
(714)434-4887
FAX:
VALUATION:
EMAIL:
kking@slaterbuilders.com
FLOOD ZONE:X-0602320256J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSThe Engineer of Record in responsible charge of the structural design of the building shall provide a statement on the truss calculation stating that he or she has reviewed and approved for loads, location, and suitability for intended use. Provide approval stamp with signature from the engineer or architect of record on the truss calculation.END OF COMMENTS