HomeMy WebLinkAbout278731_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101107759
PROJECT ADDRESS:
316 E Edgewood Rd
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/24/2021
INITIAL REVIEW
10/13/2021
EXPIRATION
2/20/2022
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Jarrett Lowe
3.
TEL:
(714)404-0194
FAX:
VALUATION: $13,000.00
EMAIL:
permitsorange@freedomforever.com
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2019
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
Drawings and all construction documents shall sign by the engineer of record.
Provide weight and dimension of each panel on the drawings.
Provide complete dimensioned roof framing plan , show location of each attachment (with dimension) on the roof plan.
Justify existing roof rafters can take load from uplift. ( show number of attachments to the each rafter)
Justify the connection roof rafter to the walls can take the uplift.